Permit: TC-MDP-0923-01519
Permit Details
Apply Date:
02/20/2024
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0923-01519
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2024 | APPROVED |
05/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/08/2024 | APPROVED |
02/21/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/27/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0923-01519
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
07/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/26/2024 | Post-Tension Inspection Report is required. | |
07/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01519
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 3/22/24: ufer needs to be moved to northwest corner, holdowns at northwest corner not fastened to reinforcement, stationary end of PT can only expose 1" of cable |
03/22/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 3/22/24: ufer needs to be moved to northwest corner, holdowns at northwest corner not fastened to reinforcement, stationary end of PT can only expose 1" of cable |
03/22/2024 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 3/22/24: ufer needs to be moved to northwest corner, holdowns at northwest corner not fastened to reinforcement, stationary end of PT can only expose 1" of cable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0923-01519
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/15/2024 | COT - RSPL - Yard Water Line | Passed | Water line is connected to main supply with City meter attached and under line pressure with no leaks. Tracer wire is in place. Okay to shade pipe and backfill trench. | |
03/15/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
03/15/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
03/15/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to backwater valve and main sewer line, and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
03/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
03/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
03/26/2024 | COT - RSBU - Preslab | Passed | ||
05/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Base plates are properly bolted down to floor, shear wall clips on exterior walls are installed and nailed off, and TJI's for roof are properly secured with H2.5 clips. | |
05/06/2024 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly nailed per plans and code. | |
05/28/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
06/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/03/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | per BO | |
07/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/05/2024 | COT - BULD - SWG Clearance | Passed | SWG FOR METER CONNECTION | |
09/11/2024 | COT - RSEL - Electrical Final | Passed | ||
09/11/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/11/2024 | COT - RSME - Mechanical Final | Passed | ||
09/11/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/11/2024 | ENGR Engineering Final | Passed | ||
09/11/2024 | RSBU - Building Final | Passed | ||
09/11/2024 | RSBU - Building Progress | Passed |