Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
11/16/2023
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-0923-01511
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
11/17/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/22/2023 APPROVED Review Details
05/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0923-01511
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
11/17/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/17/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/17/2023 Post-Tension Inspection Report is required.
09/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/17/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0923-01511
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/05/2024 COT - RSPL - Rough Soil Passed
03/05/2024 COT - RSPL - Sewer Passed
03/05/2024 COT - RSPL - Yard Water Line Passed
03/13/2024 COT - RSEL - Electrical Underground Passed
03/13/2024 COT - RSEL - Grounding/Bonding Passed
03/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/14/2024 COT - RSBU - Preslab Passed
04/25/2024 BULD - Electrical Clearance Passed
04/25/2024 COT - RSPL - Gas Pressure Test Passed
05/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/17/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/17/2024 COT - RSBU - Roof Nailing Passed
06/03/2024 COT - RSBU - Interior Shear Bracing Passed 6/3/24: passed ok to proceed
08/06/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/6/2024
08/29/2024 COT - RSEL - Outdoor Lighting Passed
08/29/2024 COT - RSPL - Plumbing Final Passed
08/29/2024 ENGR Engineering Final Passed Move in ready
09/04/2024 COT - RSEL - Electrical Final Passed Corrections were made. 9/4/2024
09/04/2024 COT - RSME - Mechanical Final Passed Corrections were made. 9/4/2024
09/04/2024 RSBU - Building Final Passed Corrections were made. 9/4/2024
09/04/2024 RSBU - Building Progress Passed