Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 03/13/2024 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
8/13/24: pack patio needs A.B.C properly compacted/ cleaned, per detail SD/5A holdowns require a deepen turndown of 18” ( all holdowns are under 18”), properly insulate plumbing at north west corner. PT cables at stationary end are only allowed to have 1” of exposed cable ( multiple locations with exposed cable greater than 1”). |
| 03/14/2024 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Passed |
|