Permit: TC-MDP-0825-00474
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
7417 S CHAMBER RIDGE DR
Address NEW:
7417 S CHAMBER RIDGE DR
Apply Date:
03/05/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409)
Permit Reviews
Permit Number - TC-MDP-0825-00474
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/05/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/17/2026 | APPROVED |
| 07/28/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/28/2026 | APPROVED |
| 04/24/2026 | SITE FROM MODEL PERMIT - SUBDIVISION REVISION v.1 | 04/24/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0825-00474
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409)
| Date | Description | Comments |
|---|---|---|
| 08/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/27/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/06/2026 | Post-Installed Anchor Inspection Report is required. | |
| 03/06/2026 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 08/27/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/27/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 03/06/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0825-00474
Permite Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2026 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 04/13/2026 | COT - RSBU - Preslab | N/A | Not Ready | |
| 07/28/2026 | ENGR Engineering Final | N/A | Not Ready | Site is complete. Unsatisfied Conditions, needs submittals and approvals before passing. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0825-00474
Permit Description: Mirador Ridge Blossom 1383 Plan (Model master plan TC-MDP-0725-00409)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | COT - RSPL - Rough Soil | Passed | Passed 4/1/26 | |
| 04/01/2026 | COT - RSPL - Sewer | Passed | Passed 4/1/26 | |
| 04/01/2026 | COT - RSPL - Yard Water Line | Passed | Passed 4/1/26 | |
| 04/23/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/23/2026 Main slab had been poured prior to inspection, verified and approved. Stamped engineer fix received and reinforced 8" rear patio turned down slab edge with 12"x12" footing with dowels and #4 rebar - okay to pour footing. |
|
| 04/23/2026 | COT - RSBU - Preslab | Passed | 04/23/2026 Main slab had been poured prior to inspection, verified and approved. Stamped engineer fix received and reinforced 8" rear patio turned down slab edge with 12"x12" footing with dowels and #4 rebar - okay to pour footing. |
|
| 04/30/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/30/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 05/18/2026 | BULD - Electrical Clearance | Passed | ||
| 05/18/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 05/18/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/18/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/02/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/10/2026 | COT - BULD - SWG Clearance | Passed | 7-10-2026 SWG Clearance approved. | |
| 07/28/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/28/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/28/2026 | RSBU - Building Progress | Passed | ||
| 07/29/2026 | COT - RSEL - Electrical Final | Passed | ||
| 07/30/2026 | COT - RSME - Mechanical Final | Passed | Approved corrections were made. 7/30/2026 | |
| 07/30/2026 | RSBU - Building Final | Passed | Approved corrections were made. 7/30/2026 |