Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2026 | RSBU - Building Final | Re-inspection required | 07/28/2026 Add knockout plug at main panel, add tension to garage door at laundry room to be self-closing, could not verify attic equipment and electrical. Conditions paperwork needs to be submitted. |
|
| 07/29/2026 | RSBU - Building Final | Not Ready | Ensure clean out caps are glued. Threshold at garage needs to meet ADA. Level out condenser unit. Provide spec sheet on condenser unit for clearance purposes. 7/29/2026 | |
| 07/30/2026 | RSBU - Building Final | Passed | Approved corrections were made. 7/30/2026 |