Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2026 | COT - RSBU - Excavation/Rebar/Zoning | Not Ready | ||
| 04/23/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/23/2026 Main slab had been poured prior to inspection, verified and approved. Stamped engineer fix received and reinforced 8" rear patio turned down slab edge with 12"x12" footing with dowels and #4 rebar - okay to pour footing. |