Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/05/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)

Permit Reviews

Permit Number - TC-MDP-0825-00462
Permit Status: Inspections complete
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Start Date Submittal Complete Date Status  
07/15/2026 SPECIAL INSPECTION REVIEW v.1 07/15/2026 APPROVED Review Details
03/11/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/18/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0825-00462
Permit Status: Inspections complete
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Date Description Comments
08/20/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
03/13/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/20/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/13/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/20/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/20/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/13/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0825-00462
Permite Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/07/2026 COT - RSEL - Electrical Underground N/A Not Applicable
05/11/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready Not ready trades still working

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0825-00462
Permit Description: Mirador Ridge Blossom 1465 Plan (Model master plan TC-MDP-0725-00408)
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/27/2026 COT - RSPL - Yard Water Line Passed 3.27.26
Approved and verified under air test
03/27/2026 COT - RSPL - Rough Soil Passed 3.27.26
Approved
04/07/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 04/07/2026
Approved per plan, okay to pour.
04/07/2026 COT - RSBU - Preslab Passed 04/07/2026
Approved per plan, okay to pour.
04/22/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 04/22/2026
All corrections made to prior inspection.
04/22/2026 COT - RSBU - Roof Nailing Passed 04/22/2026
All corrections made to prior inspection.
05/11/2026 BULD - Electrical Clearance Passed approved for eco
05/11/2026 COT - RSEL - Grounding/Bonding Passed pass
05/11/2026 COT - RSPL - Gas Pressure Test Passed
05/11/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5.11.26
Approved
05/18/2026 COT - RSBU - Interior Shear Bracing Passed
05/20/2026 COT - RSPL - Sewer Passed
07/10/2026 COT - RSEL - Electrical Final Passed
07/10/2026 COT - RSEL - Outdoor Lighting Passed
07/10/2026 RSBU - Building Progress Passed
07/14/2026 RSBU - Building Final Passed 07/14/2026
Corrections made.
07/14/2026 ENGR Engineering Final Passed
07/14/2026 COT - RSPL - Plumbing Final Passed 07/14/2026
Corrections made.
07/14/2026 COT - RSME - Mechanical Final Passed 07/14/2026
Corrections made.
07/15/2026 COT - BULD - SWG Clearance Passed 7-6-2026 SWG Approved.

Documents

File Name Document Type  
FINAL SIC - MIRADOR RIDGE BLOSSOM LOT 71-2026-07-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 71 START_V1.PDF DOCUMENTS VIEW
MRB 71 SIC-2026-03-05_V1.PDF DOCUMENTS VIEW