Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2026 | RSBU - Building Final | Not Ready | 7-6-2026 thermostat should be no higher than 48 inches above finish floor. Made observation during Southwest gas clearance. |
|
| 07/10/2026 | RSBU - Building Final | Re-inspection required | 07/10/2026 Line set at AC cannot be wrapped with adhesive tape, requires removable wrap with Velcro or sheet metal or similar protection to insulation (2024 IRC N1103.4 / R403.4). Cut cleanouts flush to grade. Add breaker lock to water heater breaker at main panel. Main water line has PRV - verify if tankless water heater requires expansion tank. No ladder to verify attic and equipment. |
|
| 07/14/2026 | RSBU - Building Final | Passed | 07/14/2026 Corrections made. |