Permit: TC-MDP-0824-00895
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
5605 S MISSION RD
Address NEW:
5605 S MISSION RD
Apply Date:
08/23/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037
Permit Reviews
Permit Number - TC-MDP-0824-00895
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/26/2025 | SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 | 04/14/2025 | APPROVED |
| 08/26/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 09/11/2024 | REQUIRES RESUBMIT |
| 10/08/2024 | RESTAMP - RESIDENTIAL v.1 | 10/08/2024 | APPROVED |
| 03/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/26/2025 | REQUIRES RESUBMIT |
| 09/16/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 10/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00895
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Date | Description | Comments |
|---|---|---|
| 04/14/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00895
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 01/13/25 Exterior wall anchor bolts need to be 32" on center per plan; interior pins need to 24'' on center. |
| 01/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 01/15/25 Unit 2: 1) Circuit 12 fed from panel #1 calls for 12 AWG wires, you have 14 AWG. 2) Outlet on north east wall in kitchen is on the wrong circuit; should be on circuit 1. 3) Missing outlet on north wall; should have 2 on circuit 9, and 3 on circuit 1. 4. Circuit 10 is supposed to be 12 AWG not 14. 5. Circuit 14 is supposed to be AWG 12 not 14. 6. Stopped inspection, please wire according to plan. |
| 12/17/2024 | COT - RSPL - Rough Soil | N/A | Partial Pass | 12/17/24: partial pass for plumbing underground in slab. Ok to backfill progress area. Shading required. Pending 2-way cleanout, sewer connection, grey water. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00895
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/19/29: reinforcement and footings per plan ok to proceed. | |
| 12/19/2024 | COT - RSBU - Preslab | Passed | 12/19/29: reinforcement and footings per plan ok to proceed. | |
| 01/13/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 01/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 01/13/25 Exterior wall anchor bolts need to be 32" on center per plan; interior pins need to 24'' on center. 1/14/25: corrections made ok to proceed |
|
| 01/15/2025 | COT - RSBU - Interior Shear Bracing | Passed | 01/15/25 Pass |
|
| 01/15/2025 | COT - RSEL - Grounding/Bonding | Passed | 01/15/25 Pass. |
|
| 01/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 01/17/25 Corrections made. Pass |
|
| 01/22/2025 | BULD - Electrical Clearance | Passed | 1/22/25 ready for temp power CLEARANCE ECO | |
| 02/11/2025 | COT - RSPL - Rough Soil | Passed | 2/11/25 pass, ok to backfill | |
| 02/11/2025 | COT - RSPL - Sewer | Passed | 2/11/25 pass, ok to backfill | |
| 04/25/2025 | COT - RSEL - Electrical Final | Passed | ||
| 04/25/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 04/25/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/25/2025 | COT - RSME - Mechanical Final | Passed | ||
| 04/25/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 04/25/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 04/25/2025 | RSBU - Building Final | Passed | ||
| 05/01/2025 | ENGR Engineering Final | Passed |