Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 01/15/25 Unit 2: 1) Circuit 12 fed from panel #1 calls for 12 AWG wires, you have 14 AWG. 2) Outlet on north east wall in kitchen is on the wrong circuit; should be on circuit 1. 3) Missing outlet on north wall; should have 2 on circuit 9, and 3 on circuit 1. 4. Circuit 10 is supposed to be 12 AWG not 14. 5. Circuit 14 is supposed to be AWG 12 not 14. 6. Stopped inspection, please wire according to plan. |
|
| 01/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 01/17/25 Corrections made. Pass |