Permit: TC-MDP-0824-00875
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
10072 S ARNOLD RANCH CT
Address NEW:
10072 S ARNOLD RANCH CT
Apply Date:
08/23/2024
Applicant:
Description:
SFR RKK35G T21-M0090
Permit Reviews
Permit Number - TC-MDP-0824-00875
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0824-00875
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/22/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 08/30/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/30/2024 | Post-Tension Inspection Report is required. |
| 08/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0824-00875
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Date | Description | Comments |
|---|---|---|
| 08/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00875
Permite Description: SFR RKK35G T21-M0090
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 10/4/24: compaction at slab not complete, footing depth not per plan calls for 12" min, Masa clips not properly set/spaced, reinforcement overlaps not per plan, reinforcement AT ENTRY t&B must have a clearance of 2" from each other. |
| 10/04/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 10/4/24: compaction at slab not complete, footing depth not per plan calls for 12" min, Masa clips not properly set/spaced, reinforcement overlaps not per plan, reinforcement AT ENTRY t&B must have a clearance of 2" from each other. |
| 10/04/2024 | COT - RSEL - Electrical Underground | N/A | Re-inspection required | 10/4/24: compaction at slab not complete, footing depth not per plan calls for 12" min, Masa clips not properly set/spaced, reinforcement overlaps not per plan, reinforcement AT ENTRY t&B must have a clearance of 2" from each other. |
| 10/04/2024 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 10/4/24: compaction at slab not complete, footing depth not per plan calls for 12" min, Masa clips not properly set/spaced, reinforcement overlaps not per plan, reinforcement AT ENTRY t&B must have a clearance of 2" from each other. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00875
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2024 | COT - RSPL - Yard Water Line | Passed | Approved. Okay to backfill-provide shading.9-23-2024 | |
| 09/23/2024 | COT - RSPL - Sewer | Passed | Sewer verified per approved plans.Okay to backfill. 9-23-2024 | |
| 09/23/2024 | COT - RSPL - Rough Soil | Passed | Rough plumbing per approved plans.Okay to proceed. | |
| 09/23/2024 | COT - RSPL - Backwater Valve | Passed | Backwater valve per approved plans. Okay to backfill -provide shading. | |
| 10/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/9/24: Compaction is complete, masa clips are spaced evenly at 32" apart, rebar overlaps have been corrected. Okay to pour concrete. | |
| 10/09/2024 | COT - RSBU - Preslab | Passed | 10/9/24: Compaction is complete, masa clips are spaced evenly at 32" apart, rebar overlaps have been corrected. Okay to pour concrete. | |
| 10/09/2024 | COT - RSEL - Electrical Underground | Passed | 10/9/24: Compaction is complete, masa clips are spaced evenly at 32" apart, rebar overlaps have been corrected. Okay to pour concrete. | |
| 10/29/2024 | COT - RSBU - Roof Nailing | Passed | 10-29-24, preslab verified per approved plans. Okay to pour concrete. | |
| 10/29/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10-29-24, exterior clip/sheathing per approved plans. Okay to continue with construction. | |
| 12/10/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-10-24, gas pressure test verified at 15 psi. | |
| 12/10/2024 | BULD - Electrical Clearance | Passed | 12-10-24, panel okay to be energized, ECO clearance issued to TEP. | |
| 12/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12-11-24, corrections made, intermediates approved. | |
| 12/11/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-11-24, approved. | |
| 12/24/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear bracing, ok to tape 12/24/24 | |
| 02/14/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 2/14/25 | |
| 03/03/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/03/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/03/2025 | ENGR Engineering Final | Passed | Exterior gate needs to be installed, CO Ready | |
| 03/03/2025 | RSBU - Building Progress | Passed | ||
| 03/06/2025 | COT - RSEL - Electrical Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | COT - RSME - Mechanical Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | RSBU - Building Final | Passed | 6 March 25 Pass |