Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/23/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0824-00869
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
09/25/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0824-00869
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
08/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/27/2024 Post-Tension Inspection Report is required.
09/27/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0824-00869
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
08/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00869
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/18/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 12/18/24 bracing at truss H10A have been made. either a letter accepting responsibility for the roof must be submitted, stamped, and approved before final or tar paper along with other materials on roof must be taken off for re inspection off roof nailing.
03/20/2025 COT - BULD - SWG Clearance N/A Canceled 3-20-25, canceled by contractor

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00869
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/01/2024 COT - RSPL - Yard Water Line Passed 11-1-24, main water line per approved plans. Okay to backfill.
11/01/2024 COT - RSPL - Sewer Passed 11-1-24, sewer line connection per approved plans. Okay to backfill.
11/01/2024 COT - RSPL - Rough Soil Passed 11-1-24, underground plumbing per approved plans. Okay to backfill.
11/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-14-24, preslab, zoning/setbacks, ufer verified as per approved plans. Okay to pour concrete.
11/14/2024 COT - RSBU - Preslab Passed 11-14-24, preslab approved. Okay to pour concrete.
11/14/2024 COT - RSEL - Electrical Underground Passed 11-14-24, preslab, zoning/setbacks, ufer verified as per approved plans. Okay to pour concrete.
11/14/2024 COT - RSEL - Grounding/Bonding Passed 11-14-24, preslab, zoning/setbacks, ufer verified as per approved plans. Okay to pour concrete.
12/18/2024 COT - RSBU - Roof Nailing Passed 12/18/24 bracing at truss H10A have been made. Roof nailing Approved. EWS
12/20/2024 RSBU - Building Progress Passed
01/15/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 1/15/25 ok to drywall
01/15/2025 COT - RSPL - Gas Pressure Test Passed Passed 1/15/25 ok to drywall
01/28/2025 COT - RSBU - Interior Shear Bracing Passed 1/28/25 pass
03/10/2025 BULD - Electrical Clearance Passed 10 March 25
TEP CLEARANCE: ECO
03/25/2025 COT - BULD - SWG Clearance Passed 3/25/25 CLEARANCE SWG
04/02/2025 COT - RSEL - Electrical Final Passed Passed final 4/2/25 CLEARANCE ECO
04/02/2025 COT - RSEL - Outdoor Lighting Passed Passed 4/2/25
04/02/2025 COT - RSME - Mechanical Final Passed Passed 4/2/25
04/02/2025 COT - RSPL - Plumbing Final Passed Passed final 4/2/25
04/02/2025 RSBU - Building Final Passed Passed final 4/2/25
04/11/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-09-23_V1.PDF DOCUMENTS VIEW