Permit: TC-MDP-0823-01453
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12746 E MEAGAN RIDGE PL
Address NEW:
12746 E MEAGAN RIDGE PL
Apply Date:
08/22/2023
Applicant:
Paul Corr
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)
Permit Reviews
Permit Number - TC-MDP-0823-01453
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2024 | APPROVED |
| 06/24/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01453
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/25/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/25/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/25/2024 | Post-Tension Inspection Report is required. |
| 06/25/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0823-01453
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Date | Description | Comments |
|---|---|---|
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01453
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2024 | COT - RSPL - Sewer | N/A | Re-inspection required | Underground plumbing is not under water test. Fill all pipes and recall for an inspection. |
| 08/12/2024 | COT - RSPL - Rough Soil | N/A | Re-inspection required | Underground plumbing is not under water test. Fill all pipes and recall for an inspection. |
| 08/12/2024 | COT - RSPL - Backwater Valve | N/A | Re-inspection required | Underground plumbing is not under water test. Fill all pipes and recall for an inspection. |
| 09/23/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 9/23/24: Anchor bolts need to be placed 12" from edge where MASA clips are installed with 2 legs up, 1 in 3 MASA clips can have 1 leg up (multiple locations where 1 in 3 is exceeded), interior non bearing walls must be properly fastened at sill plate no greater than 36" o.c, bracing at trusses missing per clacs, front entry way column needs to be properly supported, no roof access. |
| 09/23/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 9/23/24: Anchor bolts need to be placed 12" from edge where MASA clips are installed with 2 legs up, 1 in 3 MASA clips can have 1 leg up (multiple locations where 1 in 3 is exceeded), interior non bearing walls must be properly fastened at sill plate no greater than 36" o.c, bracing at trusses missing per clacs, front entry way column needs to be properly supported, no roof access. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01453
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2024 | COT - RSPL - Yard Water Line | Passed | Water line is installed from meter to house with blue tracer wire installed. Line is under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 08/13/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/13/2024 | |
| 08/13/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/13/2024 | |
| 08/13/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 8/13/2024 | |
| 08/23/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly spaced per pan, masa clips are attached to form at a 2' spacing, shear wall clips are attached to form per plan, rebar reinforcement is installed as required by plan, Ufer ground is installed on transformer side of garage, and all underground plumbing is properly wrapped with foam. | |
| 08/23/2024 | COT - RSEL - Electrical Underground | Passed | Electrical conduit installed for kitchen island. Okay to pour concrete. | |
| 08/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly spaced per pan, masa clips are attached to form at a 2' spacing, shear wall clips are attached to form per plan, rebar reinforcement is installed as required by plan, Ufer ground is installed on transformer side of garage, and all underground plumbing is properly wrapped with foam. | |
| 09/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 11/05/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-5-24, anchor bolts in question from previous inspections verified as per approved plans. | |
| 11/05/2024 | BULD - Electrical Clearance | Passed | 11-5-24, electrical panel okay to be be energized. Clearance to TEP issued. | |
| 11/05/2024 | COT - RSPL - Gas Pressure Test | Passed | 11-5-24, gas pressure test verified at 15 psi. | |
| 11/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-6-24: Thermostats have been lowered to 54". H2.5 clips in laundry have been nailed off. Okay to proceed insulation and drywall installation. | |
| 11/19/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-19-24, interior shear wall per approved plans. Okay to tape and texture drywall | |
| 01/24/2025 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at each gas appliance location. Okay to proceed with meter installation. | |
| 02/20/2025 | COT - RSME - Mechanical Final | Passed | 2/20/25 pass | |
| 02/20/2025 | RSBU - Building Final | Passed | 2/20/25 pass | |
| 02/20/2025 | ENGR Engineering Final | Passed | Site is good. | |
| 02/20/2025 | COT - RSEL - Outdoor Lighting | Passed | 2/20/25 pass | |
| 02/20/2025 | COT - RSPL - Plumbing Final | Passed | 2/20/25 pass | |
| 02/20/2025 | RSBU - Building Progress | Passed | 2/20/25 pass | |
| 02/20/2025 | COT - RSEL - Electrical Final | Passed | 2/20/25 pass |