Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01450
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12757 E LAZY J RANCH PL
Address NEW:
12757 E LAZY J RANCH PL
Apply Date:
08/23/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)
Permit Reviews
Permit Number - TC-MDP-0823-01450
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2023 | APPROVED |
| 08/23/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01450
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/23/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/23/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/23/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/23/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 08/28/2023 | Post-Tension Inspection Report is required. |
| 08/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01450
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Date | Description | Comments |
|---|---|---|
| 09/27/2023 | ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P21SD0033 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ | |
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01450
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 7/31/24: irrigation breaker not installed, "for future solar" required at panel,secure electrical whip at irrigation, fencing not installed at time of inspection, 6" min from weep screed to grade , UV tape hose bib, gray water clean outs must be cut to grade and capped, Pad at A/C condenser needs 3" clearance form grade on all sides, high loop at dishwasher must be installed, no attic access, Tempered glass not installed at master shower, garage door rating tag has been painted over, |
| 07/31/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 7/31/24: irrigation breaker not installed, "for future solar" required at panel,secure electrical whip at irrigation, fencing not installed at time of inspection, 6" min from weep screed to grade , UV tape hose bib, gray water clean outs must be cut to grade and capped, Pad at A/C condenser needs 3" clearance form grade on all sides, high loop at dishwasher must be installed, no attic access, Tempered glass not installed at master shower, garage door rating tag has been painted over, |
| 07/31/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 7/31/24: irrigation breaker not installed, "for future solar" required at panel,secure electrical whip at irrigation, fencing not installed at time of inspection, 6" min from weep screed to grade , UV tape hose bib, gray water clean outs must be cut to grade and capped, Pad at A/C condenser needs 3" clearance form grade on all sides, high loop at dishwasher must be installed, no attic access, Tempered glass not installed at master shower, garage door rating tag has been painted over, |
| 07/31/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 7/31/24: irrigation breaker not installed, "for future solar" required at panel,secure electrical whip at irrigation, fencing not installed at time of inspection, 6" min from weep screed to grade , UV tape hose bib, gray water clean outs must be cut to grade and capped, Pad at A/C condenser needs 3" clearance form grade on all sides, high loop at dishwasher must be installed, no attic access, Tempered glass not installed at master shower, garage door rating tag has been painted over, |
| 07/31/2024 | RSBU - Building Final | N/A | Re-inspection required | 7/31/24: irrigation breaker not installed, "for future solar" required at panel,secure electrical whip at irrigation, fencing not installed at time of inspection, 6" min from weep screed to grade , UV tape hose bib, gray water clean outs must be cut to grade and capped, Pad at A/C condenser needs 3" clearance form grade on all sides, high loop at dishwasher must be installed, no attic access, Tempered glass not installed at master shower, garage door rating tag has been painted over, |
| 07/31/2024 | RSBU - Building Progress | N/A | Re-inspection required | 7/31/24: irrigation breaker not installed, "for future solar" required at panel,secure electrical whip at irrigation, fencing not installed at time of inspection, 6" min from weep screed to grade , UV tape hose bib, gray water clean outs must be cut to grade and capped, Pad at A/C condenser needs 3" clearance form grade on all sides, high loop at dishwasher must be installed, no attic access, Tempered glass not installed at master shower, garage door rating tag has been painted over, |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01450
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 03/20/2024 | COT - RSPL - Sewer | Passed | ||
| 03/20/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 04/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 4/3/24: Excess water has been removed from trenches, Masa clips have been added to form, and debris has been removed from trenches and slab area. Okay to pour concrete when ready. | |
| 04/03/2024 | COT - RSBU - Preslab | Passed | 4/3/24: Excess water has been removed from trenches, Masa clips have been added to form, and debris has been removed from trenches and slab area. Okay to pour concrete when ready. | |
| 04/03/2024 | COT - RSEL - Grounding/Bonding | Passed | 4/3/24: Excess water has been removed from trenches, Masa clips have been added to form, and debris has been removed from trenches and slab area. Okay to pour concrete when ready. | |
| 04/18/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/24/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/24/24: RSP clip has been added to east side of house, hurricane ties have been properly nailed on interior walls, and shear sheathing is properly secured to studs. Okay to proceed with window and door installation. | |
| 05/15/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 05/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/06/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/25/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 07/31/2024 | ENGR Engineering Final | Passed | Just a note, screen fence on left side not completed | |
| 08/07/2024 | COT - RSEL - Electrical Final | Passed | 8/7/24: All items from last inspection have been corrected or cleaned. Mechanical, electrical, and plumbing fixtures are installed and properly working. Electrical panel is properly labeled with correct breaker sizes installed. Okay to issue Certificate of Occupancy once Fire and engineering complete their inspections. | |
| 08/07/2024 | COT - RSEL - Outdoor Lighting | Passed | 8/7/24: All items from last inspection have been corrected or cleaned. Mechanical, electrical, and plumbing fixtures are installed and properly working. Electrical panel is properly labeled with correct breaker sizes installed. Okay to issue Certificate of Occupancy once Fire and engineering complete their inspections. | |
| 08/07/2024 | COT - RSME - Mechanical Final | Passed | 8/7/24: All items from last inspection have been corrected or cleaned. Mechanical, electrical, and plumbing fixtures are installed and properly working. Electrical panel is properly labeled with correct breaker sizes installed. Okay to issue Certificate of Occupancy once Fire and engineering complete their inspections. | |
| 08/07/2024 | COT - RSPL - Plumbing Final | Passed | 8/7/24: All items from last inspection have been corrected or cleaned. Mechanical, electrical, and plumbing fixtures are installed and properly working. Electrical panel is properly labeled with correct breaker sizes installed. Okay to issue Certificate of Occupancy once Fire and engineering complete their inspections. | |
| 08/07/2024 | RSBU - Building Final | Passed | 8/7/24: All items from last inspection have been corrected or cleaned. Mechanical, electrical, and plumbing fixtures are installed and properly working. Electrical panel is properly labeled with correct breaker sizes installed. Okay to issue Certificate of Occupancy once Fire and engineering complete their inspections. | |
| 08/07/2024 | RSBU - Building Progress | Passed |