Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/14/2023
Applicant:
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-0823-01447
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
12/15/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/26/2023 APPROVED Review Details
03/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01447
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Total Outstanding Activity Conditions - 3
Date Name
03/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/27/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0823-01447
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Date Description Comments
03/27/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01447
Permite Description: SFR K35I T21-M0034
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/13/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Canceled
03/13/2024 COT - RSBU - Preslab N/A Canceled 3/13/24: canceled per David
03/13/2024 COT - RSEL - Grounding/Bonding N/A Canceled 3/13/24: canceled per David

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01447
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/28/2024 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading is required. 2/28/2024
02/28/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 2/28/2024
02/28/2024 COT - RSPL - Sewer Passed
02/28/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 2/28/2024
03/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 3/13/24: canceled per David
3/14/24: passed. Ok to proceed
03/14/2024 COT - RSBU - Preslab Passed 3/13/24: canceled per David
3/14/24: passed. Ok to proceed
03/14/2024 COT - RSEL - Grounding/Bonding Passed 3/13/24: canceled per David
3/14/24: passed. Ok to proceed
03/27/2024 COT - RSEL - Electrical Underground Passed
03/27/2024 COT - RSBU - Roof Nailing Passed
03/28/2024 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 3/28/2024
04/17/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 4/17/2024
04/17/2024 COT - RSPL - Gas Pressure Test Passed
04/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/01/2024 COT - RSBU - Interior Shear Bracing Passed
06/07/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/7/2024
06/24/2024 COT - RSEL - Electrical Final Passed
06/24/2024 COT - RSEL - Outdoor Lighting Passed
06/24/2024 COT - RSME - Mechanical Final Passed
06/24/2024 COT - RSPL - Plumbing Final Passed
06/21/2024 ENGR Engineering Final Passed
06/24/2024 RSBU - Building Final Passed
06/21/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
K35I APPROVED TRUSS CALCS 10-18-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-12-14_V1.PDF DOCUMENTS VIEW