Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6507 E PASEO BARANDA
Apply Date:
08/11/2023
Applicant:
Brianna Quiroz
Description:
510 Eisenhower Model Plan

Permit Reviews

Permit Number - TC-MDP-0823-01386
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
Start Date Submittal Complete Date Status  
08/14/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/16/2023 APPROVED Review Details
09/07/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 09/07/2023 APPROVED Review Details
05/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/10/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0823-01386
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
Date Description Comments
05/10/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/22/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/09/2024 Post-Installed Anchor Inspection Report is required.
08/15/2023 Post-Tension Inspection Report is required.
05/10/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/09/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
05/10/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/22/2022 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01386
Permite Description: 510 Eisenhower Model Plan
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/27/2023 COT - BULD - SWG Clearance N/A Not Applicable
09/27/2023 COT - RSPL - Gas Pressure Test N/A Not Applicable
01/02/2024 RSBU - Building Progress N/A Re-inspection required Ufer not connected to GEC, nail plates needed at second floor room front of house,

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01386
Permit Description: 510 Eisenhower Model Plan
Total Completed Inspections - 19