Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/03/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35G T21-M0090

Permit Reviews

Permit Number - TC-MDP-0823-01311
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Start Date Submittal Complete Date Status  
12/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/23/2023 APPROVED Review Details
08/04/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/08/2023 REQUIRES RESUBMIT Review Details
08/16/2023 RESTAMP - RESIDENTIAL v.1 08/16/2023 APPROVED Review Details
08/15/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/16/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01311
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 1
Date Name
08/08/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01311
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Date Description Comments
08/04/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/04/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/22/2023 NO FINAL UNTIL THE DISCHARGE AUTHORIZATIONFOR #P21SD00033 IS ISSUED BY PDEQ
08/04/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/16/2023 Post-Tension Inspection Report is required.
08/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/04/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01311
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/18/2023 COT - RSPL - Rough Soil Passed 9/18/23: rough soil passed
09/18/2023 COT - RSPL - Sewer Passed
09/18/2023 COT - RSPL - Yard Water Line Passed
09/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/29/2023 COT - RSBU - Preslab Passed
09/29/2023 COT - RSEL - Electrical Underground Passed
09/29/2023 COT - RSEL - Grounding/Bonding Passed
10/23/2023 COT - RSBU - Roof Nailing Passed
10/26/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/21/2023 BULD - Electrical Clearance Passed passed
12/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed passed
12/21/2023 COT - RSPL - Gas Pressure Test Passed passed
01/08/2024 COT - RSBU - Interior Shear Bracing Passed Interior shear walls are properly installed and screwed per plan details. Okay to proceed with taping, texture, and paint.
03/11/2024 COT - BULD - SWG Clearance Passed Gas valves are installed at kitchen stove, laundry room dryer, and garage water heater.
03/15/2024 COT - RSEL - Electrical Final Passed Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections.
03/15/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plans.
03/15/2024 COT - RSME - Mechanical Final Passed Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections.
03/15/2024 COT - RSPL - Plumbing Final Passed Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections.
03/15/2024 RSBU - Building Final Passed Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections.
03/15/2024 ENGR Engineering Final Passed
03/15/2024 RSBU - Building Progress Passed Construction is complete. Mechanical, plumbing, and electrical fixtures are installed and operational.

Documents

File Name Document Type  
220365 RINCON KNOLLS PT REPORT LOT 206-2023-12-21_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V2.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V2.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-03_V1.PDF DOCUMENTS VIEW