Permit: TC-MDP-0823-01311
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12738 E HUSTON CANYON WY
Address NEW:
12738 E HUSTON CANYON WY
Apply Date:
08/03/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35G T21-M0090
Permit Reviews
Permit Number - TC-MDP-0823-01311
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/23/2023 | APPROVED |
| 08/04/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/08/2023 | REQUIRES RESUBMIT |
| 08/16/2023 | RESTAMP - RESIDENTIAL v.1 | 08/16/2023 | APPROVED |
| 08/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/16/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01311
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/08/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01311
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
| Date | Description | Comments |
|---|---|---|
| 08/04/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/04/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 12/22/2023 | NO FINAL UNTIL THE DISCHARGE AUTHORIZATIONFOR #P21SD00033 IS ISSUED BY PDEQ | |
| 08/04/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/16/2023 | Post-Tension Inspection Report is required. | |
| 08/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/04/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01311
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2023 | COT - RSPL - Rough Soil | Passed | 9/18/23: rough soil passed | |
| 09/18/2023 | COT - RSPL - Sewer | Passed | ||
| 09/18/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 09/29/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/29/2023 | COT - RSBU - Preslab | Passed | ||
| 09/29/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 09/29/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/23/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 10/26/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/21/2023 | BULD - Electrical Clearance | Passed | passed | |
| 12/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | passed | |
| 12/21/2023 | COT - RSPL - Gas Pressure Test | Passed | passed | |
| 01/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls are properly installed and screwed per plan details. Okay to proceed with taping, texture, and paint. | |
| 03/11/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at kitchen stove, laundry room dryer, and garage water heater. | |
| 03/15/2024 | COT - RSEL - Electrical Final | Passed | Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections. | |
| 03/15/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plans. | |
| 03/15/2024 | COT - RSME - Mechanical Final | Passed | Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections. | |
| 03/15/2024 | COT - RSPL - Plumbing Final | Passed | Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections. | |
| 03/15/2024 | RSBU - Building Final | Passed | Building is complete. Mechanical, plumbing, and electrical fixtures are installed and fully functional, GFCI receptacles are installed in kitchen, laundry room, and bathrooms. AFCI breakers are installed in electrical panel for all bedrooms. Gas stove has anti-tip device and is functioning properly. Okay to issue Certificate of Occupancy after all other departments sign off on their inspections. | |
| 03/15/2024 | ENGR Engineering Final | Passed | ||
| 03/15/2024 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, plumbing, and electrical fixtures are installed and operational. |