Permit: TC-MDP-0724-00791
Permit Details
Apply Date:
07/18/2024
Applicant:
Stephanie Bebee
Description:
PV 1520 SFR
Permit Reviews
Permit Number - TC-MDP-0724-00791
Permit Status: Issued
Permit Description: PV 1520 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/30/2024 | REQUIRES RESUBMIT |
11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
08/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/07/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00791
Permit Status: Issued
Permit Description: PV 1520 SFR
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
07/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0724-00791
Permit Status: Issued
Permit Description: PV 1520 SFR
Date | Description | Comments |
---|---|---|
08/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/07/2024 | Post-Tension Inspection Report is required. | |
07/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0724-00791
Permite Description: PV 1520 SFR
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/06/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 9/6/24: Partial for UFER |
11/14/2024 | COT - RSBU - Interior Shear Bracing | N/A | Partial Pass | 10/7/24: anchor bolts at shear-walls and exterior walls not per plan, properly fasten all anchor bolts, rsp4 not per plan, detail S2.1/14 missing on plans at interior bearing walls. Shot pins required 6" from edge of sill plate, shot pins required 36" o.c 11/14/24: partial pass for 5/8 type x on exterior above roof line on fire wall ok to proceed. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0724-00791
Permit Description: PV 1520 SFR
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/29/2024 | COT - RSPL - Rough Soil | Passed | 8/29/24: plumbing underground per plans ok to proceed with backfill, shading required | |
08/29/2024 | COT - RSPL - Backwater Valve | Passed | ||
08/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
09/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/6/24: reinforcement per plan. Ok to proceed | |
09/06/2024 | COT - RSBU - Preslab | Passed | 9/6/24: reinforcement per plan. Ok to proceed | |
09/06/2024 | COT - RSEL - Electrical Underground | Passed | 9/6/24: electrical underground passed. | |
10/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 10/7/24: anchor bolts at shear-walls and exterior walls not per plan, properly fasten all anchor bolts, rsp4 not per plan, detail S2.1/14 missing on plans at interior bearing walls. Shot pins required 6" from edge of sill plate, shot pins required 36" o.c 10/9/24: corrections made. Ok to proceed |