Permit: TC-MDP-0724-00791
Permit Details
Apply Date:
07/18/2024
Applicant:
Mark Alteri
Description:
PV 1520 SFR
Permit Reviews
Permit Number - TC-MDP-0724-00791
Permit Status: Complete
Permit Description: PV 1520 SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/30/2024 | REQUIRES RESUBMIT |
| 11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
| 12/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/17/2024 | APPROVED |
| 08/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/07/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00791
Permit Status: Complete
Permit Description: PV 1520 SFR
| Date | Description | Comments |
|---|---|---|
| 08/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/07/2024 | Post-Tension Inspection Report is required. | |
| 07/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00791
Permite Description: PV 1520 SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 9/6/24: Partial for UFER |
| 12/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 12/23/24 Water not under pressure, vapor barriers must be sealed a penetrations and stud shoes are required where mini splits penetrate. |
| 03/21/2025 | ENGR Engineering Final | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00791
Permit Description: PV 1520 SFR
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2024 | COT - RSPL - Rough Soil | Passed | 8/29/24: plumbing underground per plans ok to proceed with backfill, shading required | |
| 08/29/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 08/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/6/24: reinforcement per plan. Ok to proceed | |
| 09/06/2024 | COT - RSBU - Preslab | Passed | 9/6/24: reinforcement per plan. Ok to proceed | |
| 09/06/2024 | COT - RSEL - Electrical Underground | Passed | 9/6/24: electrical underground passed. | |
| 10/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/09/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/7/24: anchor bolts at shear-walls and exterior walls not per plan, properly fasten all anchor bolts, rsp4 not per plan, detail S2.1/14 missing on plans at interior bearing walls. Shot pins required 6" from edge of sill plate, shot pins required 36" o.c 10/9/24: corrections made. Ok to proceed |
|
| 12/19/2024 | COT - RSPL - Sewer | Passed | ||
| 12/23/2024 | COT - RSPL - Gas Pressure Test | Passed | pass | |
| 01/07/2025 | COT - RSEL - Grounding/Bonding | Passed | 1-7-25, grounding/bonding inspection approved. | |
| 01/21/2025 | BULD - Electrical Clearance | Passed | Clearance code is ECO. EWS | |
| 01/22/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Passed, ok to tape 1/22/25 | |
| 01/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed, ok to tape 1/22/25 | |
| 02/10/2025 | RSBU - Building Progress | Passed | ||
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | Ok to set meter and begin service. | |
| 03/27/2025 | COT - RSEL - Electrical Final | Passed | Passed 3/27/25 | |
| 03/27/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 3/27/25 | |
| 03/27/2025 | COT - RSME - Mechanical Final | Passed | Passed final 3/27/27 | |
| 03/27/2025 | RSBU - Building Final | Passed | Passed 3/27/25 | |
| 03/27/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 3/27/27 | |
| 04/10/2025 | ENGR Engineering Final | Passed | Models are CO Ready |