Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0724-00791
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-3-24, panel schedule not per approved plans-provide an updated schematic to the city for review and approval. Fire foam all penetrations at top plates. Pex in several locations is w/in 12 inches of a can lights. Provide blocking or insulation at affected areas. | |
01/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-6-25, no plans on site. See previous notes with regards to missing firefoam. | |
01/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 1-7-25, okay to proceed construction at own risk. Waiting on updated electrical schematic for panel schedule. Additionally, this model will be temporarily used as a sales office and the garage has been constructed to fit those needs. Contractor has submitted a revision to the city for review and will be obtaining an additional permit. Meanwhile, permission has been granted to continue construction but will be done at own risk. | |
12/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 12/23/24 Water not under pressure, vapor barriers must be sealed a penetrations and stud shoes are required where mini splits penetrate. |