Permit: TC-MDP-0724-00789
Permit Details
Apply Date:
07/18/2024
Applicant:
Mark Alteri
Description:
PV 1882 SFR
Permit Reviews
Permit Number - TC-MDP-0724-00789
Permit Status: Complete
Permit Description: PV 1882 SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/17/2024 | APPROVED |
| 07/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/30/2024 | REQUIRES RESUBMIT |
| 11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
| 08/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/07/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00789
Permit Status: Complete
Permit Description: PV 1882 SFR
| Date | Description | Comments |
|---|---|---|
| 08/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/07/2024 | Post-Tension Inspection Report is required. | |
| 07/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00789
Permite Description: PV 1882 SFR
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2024 | COT - RSBU - Interior Shear Bracing | N/A | Partial Pass | 12/22/24 shear wall at second floor opposite closet not to schedule, and missing screws at bedroom by patio wall. |
| 12/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | |
| 04/10/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 4/10/25: Knock-outs at main panel must be sealed, liquid tight at irrigation system must be secured, 1/2" conduit at irrigation box must be secured, exposed in treated wood must be treated at final inspection, hose bibs must be insulated, hot water lines at garage must be insulated, post tension tag required at exterior hose bib, garage must be self closing and rated, secure gas line under range, high loop at dishwasher must be properly secured, properly secure electrical whip for oven and install faceplate, GFCI required at bathrooms, plumbing fixtures not installed. Exterior plastic piping must be coated for UV protection, all faceplates at boxes must be properly installed, WR receptacles required on exterior of home . STOPPED INSPECTION MORE ITEMS MAY BE ADDED (second floor was not inspected) |
| 04/10/2025 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 4/10/25: Knock-outs at main panel must be sealed, liquid tight at irrigation system must be secured, 1/2" conduit at irrigation box must be secured, exposed in treated wood must be treated at final inspection, hose bibs must be insulated, hot water lines at garage must be insulated, post tension tag required at exterior hose bib, garage must be self closing and rated, secure gas line under range, high loop at dishwasher must be properly secured, properly secure electrical whip for oven and install faceplate, GFCI required at bathrooms, plumbing fixtures not installed. Exterior plastic piping must be coated for UV protection, all faceplates at boxes must be properly installed, WR receptacles required on exterior of home . STOPPED INSPECTION MORE ITEMS MAY BE ADDED (second floor was not inspected) |
| 04/10/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 4/10/25: Knock-outs at main panel must be sealed, liquid tight at irrigation system must be secured, 1/2" conduit at irrigation box must be secured, exposed in treated wood must be treated at final inspection, hose bibs must be insulated, hot water lines at garage must be insulated, post tension tag required at exterior hose bib, garage must be self closing and rated, secure gas line under range, high loop at dishwasher must be properly secured, properly secure electrical whip for oven and install faceplate, GFCI required at bathrooms, plumbing fixtures not installed. Exterior plastic piping must be coated for UV protection, all faceplates at boxes must be properly installed, WR receptacles required on exterior of home . STOPPED INSPECTION MORE ITEMS MAY BE ADDED (second floor was not inspected) |
| 04/10/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 4/10/25: Knock-outs at main panel must be sealed, liquid tight at irrigation system must be secured, 1/2" conduit at irrigation box must be secured, exposed in treated wood must be treated at final inspection, hose bibs must be insulated, hot water lines at garage must be insulated, post tension tag required at exterior hose bib, garage must be self closing and rated, secure gas line under range, high loop at dishwasher must be properly secured, properly secure electrical whip for oven and install faceplate, GFCI required at bathrooms, plumbing fixtures not installed. Exterior plastic piping must be coated for UV protection, all faceplates at boxes must be properly installed, WR receptacles required on exterior of home . STOPPED INSPECTION MORE ITEMS MAY BE ADDED (second floor was not inspected) |
| 04/10/2025 | RSBU - Building Final | N/A | Re-inspection required | 4/10/25: Knock-outs at main panel must be sealed, liquid tight at irrigation system must be secured, 1/2" conduit at irrigation box must be secured, exposed in treated wood must be treated at final inspection, hose bibs must be insulated, hot water lines at garage must be insulated, post tension tag required at exterior hose bib, garage must be self closing and rated, secure gas line under range, high loop at dishwasher must be properly secured, properly secure electrical whip for oven and install faceplate, GFCI required at bathrooms, plumbing fixtures not installed. Exterior plastic piping must be coated for UV protection, all faceplates at boxes must be properly installed, WR receptacles required on exterior of home . STOPPED INSPECTION MORE ITEMS MAY BE ADDED (second floor was not inspected) |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00789
Permit Description: PV 1882 SFR
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 08/30/2024 | COT - RSPL - Rough Soil | Passed | ||
| 08/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/6/24: reinforcement per plan. Ok to proceed | |
| 09/06/2024 | COT - RSBU - Preslab | Passed | 9/6/24: reinforcement per plan ok to proceed, | |
| 09/06/2024 | COT - RSEL - Electrical Underground | Passed | 9/6/24: Electrical underground per plans | |
| 10/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/09/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/7/24: anchor bolts at shear-walls and exterior walls not per plan, properly fasten all anchor bolts, rsp4 not per plan, detail S2.1/14 missing on plans at interior bearing walls. Shot pins required 6" from edge of sill plate, shot pins required 36" o.c 10/9/24: corrections made. Ok to proceed |
|
| 12/05/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/19/2024 | COT - RSPL - Sewer | Passed | ||
| 12/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/26/24 corrections were made. PASS | |
| 01/21/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 02/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/05/2025 | COT - RSPL - Gas Pressure Test | Passed | 3/5/25: SWG CLEARANCE APPROVED OK FOR METER TAG | |
| 03/05/2025 | COT - BULD - SWG Clearance | Passed | 3/5/25: SWG CLEARANCE APPROVED OK FOR METER TAG | |
| 04/10/2025 | ENGR Engineering Final | Passed | Models are CO Ready | |
| 04/10/2025 | RSBU - Building Progress | Passed | ||
| 04/18/2025 | COT - RSEL - Electrical Final | Passed | 4-18-25, electrical final approved. | |
| 04/18/2025 | COT - RSEL - Outdoor Lighting | Passed | 4-18-25, approved. | |
| 04/18/2025 | COT - RSME - Mechanical Final | Passed | 4-18-25, mechanical final approved. | |
| 04/18/2025 | COT - RSPL - Plumbing Final | Passed | 4-18-26, plumbing & building final approved | |
| 04/18/2025 | RSBU - Building Final | Passed | 4-18-26, plumbing & building final approved |