Parcel: 132131860


Addresses:

2667 S AYALA ST


Inspection Status: Partial Pass

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0724-00789

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Partial Pass

Date Description Inspector Results Comments
02/13/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 2/13/25 main panel missing breakers
02/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
12/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12/4/24: grounding at subpanel missing, seal all penetrations through vapor barrier, properly secure 1/0 AWG conductors at subpanel, multiple circuits missing at panel (called out for 35 circuits), seal all penetrations through second floor decking, wrong wire size at multiple circuits, seal underground sleeve, DWV not under test, properly secure NM cable 48" o.c at living room, secure flex in attic, seal penetration through top plate, shower/tub not under test, seal mechanical chase. MORE ITEMS MAY BE ADDED
12/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 12/4/24: grounding at subpanel missing, seal all penetrations through vapor barrier, properly secure 1/0 AWG conductors at subpanel, multiple circuits missing at panel (called out for 35 circuits), seal all penetrations through second floor decking, wrong wire size at multiple circuits, seal underground sleeve, DWV not under test, properly secure NM cable 48" o.c at living room, secure flex in attic, seal penetration through top plate, shower/tub not under test, seal mechanical chase. MORE ITEMS MAY BE ADDED
12/5/24: corrections made ok to proceed at risk regarding wire size not per plan and wiring not per plan.