Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0724-00789
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 2/13/25 main panel missing breakers | |
02/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
12/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 12/4/24: grounding at subpanel missing, seal all penetrations through vapor barrier, properly secure 1/0 AWG conductors at subpanel, multiple circuits missing at panel (called out for 35 circuits), seal all penetrations through second floor decking, wrong wire size at multiple circuits, seal underground sleeve, DWV not under test, properly secure NM cable 48" o.c at living room, secure flex in attic, seal penetration through top plate, shower/tub not under test, seal mechanical chase. MORE ITEMS MAY BE ADDED | |
12/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 12/4/24: grounding at subpanel missing, seal all penetrations through vapor barrier, properly secure 1/0 AWG conductors at subpanel, multiple circuits missing at panel (called out for 35 circuits), seal all penetrations through second floor decking, wrong wire size at multiple circuits, seal underground sleeve, DWV not under test, properly secure NM cable 48" o.c at living room, secure flex in attic, seal penetration through top plate, shower/tub not under test, seal mechanical chase. MORE ITEMS MAY BE ADDED 12/5/24: corrections made ok to proceed at risk regarding wire size not per plan and wiring not per plan. |