Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/23/2023
Applicant:
Andrea Flood
Description:
SFR STF40K T20-M0039 Revision Truss Calcs

Permit Reviews

Permit Number - TC-MDP-0723-01285
Permit Status: Inspections complete
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Start Date Submittal Complete Date Status  
08/23/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/28/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0723-01285
Permit Status: Inspections complete
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Activity Conditions - 6
Date Name
08/23/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/23/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/23/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/23/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/28/2023 Post-Tension Inspection Report is required.
08/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0723-01285
Permit Status: Inspections complete
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Date Description Comments
07/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0723-01285
Permite Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/21/2024 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required Missing second king stud at each end at flex room window, hallway and master bedroom entrances with 4x6 headers missing 2-2x6 studs at each end per plans, missing third lateral bracing for trusses A4, Truss A6 and A7 missing lateral bracing, missing rsp4 clip at front porch.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0723-01285
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/21/2024 COT - RSPL - Rough Soil Passed
02/27/2024 COT - RSPL - Sewer Passed
02/28/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/28/2024 COT - RSBU - Preslab Passed
02/28/2024 COT - RSPL - Backwater Valve Passed
02/28/2024 COT - RSEL - Electrical Underground Passed
03/18/2024 COT - RSPL - Yard Water Line Passed Main water line is connected to City water supply with a meter and under street pressure. Blue tracer wire is installed. Okay to shade pipe and backfill trench.
03/21/2024 COT - RSBU - Roof Nailing Passed
03/25/2024 COT - RSBU - Exterior Clips/Sheathing Passed 3/25/24: King studs have been added at window, hallway, and master bedroom entrances. Lateral bracing has been added for trusses A4, A6, & A7. RSP Clip has been installed at front porch. Okay to proceed with roof dry in and exterior stucco dry in.
04/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/10/2024 COT - RSEL - Grounding/Bonding Passed
04/10/2024 COT - RSPL - Gas Pressure Test Passed
04/19/2024 BULD - Electrical Clearance Passed 4-19-24: ECO Clearance issued for 10248 E. Civano Wash Trail to TEP.
04/22/2024 COT - RSBU - Interior Shear Bracing Passed
07/11/2024 COT - BULD - SWG Clearance Passed SWG for meter only
07/22/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections.
07/22/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed and functional. Light fixtures are what is specified on plans and meets city requirements.
07/22/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections.
07/22/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections.
07/22/2024 ENGR Engineering Final Passed Please insure that the nursery stakes are removed from the tree.
Repair the swale and berm to the right of the garage.
Grade looks like it will drain, did not see,your grade cert. label.
07/22/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections.
07/22/2024 RSBU - Building Progress Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and fully functional. Electrical panel is properly labeled and has AFCI & GFCI Breakers installed per plan and code requirements. A/C Unit has proper breakers installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments have performed their inspections.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-23_V1.PDF DOCUMENTS VIEW