Permit: TC-MDP-0723-01234
Permit Details
Apply Date:
07/17/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037 (1235 N 13th Av)
Permit Reviews
Permit Number - TC-MDP-0723-01234
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (1235 N 13th Av)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/18/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/20/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0723-01234
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (1235 N 13th Av)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/19/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0723-01234
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (1235 N 13th Av)
| Date | Description | Comments |
|---|---|---|
| 07/05/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01234
Permite Description: DUPLEX DUPLVAL82 T22-M0037 (1235 N 13th Av)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 9/12/23: missing nail schedule all around exterior of both unit 1 and unit 2, nailing must be 3/8 from edge on exterior sheathing throughout, anchor bolts must be tightened, anchor bolt missing 12" from edge of bottom plate in unit 1, power pins at 24" o.c at bottom plate at firewall, unit 2 anchor bolt spacing is greater than 48" o.c at north bedroom. Nailing schedule at fire wall not met. |
| 09/12/2023 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 9/12/23: missing nail schedule all around exterior of both unit 1 and unit 2, nailing must be 3/8 from edge on exterior sheathing throughout, anchor bolts must be tightened, anchor bolt missing 12" from edge of bottom plate in unit 1, power pins at 24" o.c at bottom plate at firewall, unit 2 anchor bolt spacing is greater than 48" o.c at north bedroom. Nailing schedule at fire wall not met. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01234
Permit Description: DUPLEX DUPLVAL82 T22-M0037 (1235 N 13th Av)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/10/2023 | |
| 08/10/2023 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/10/2023 | |
| 08/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/14/2023 | COT - RSBU - Preslab | Passed | ||
| 08/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/12/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 09/15/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/15/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 09/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/27/2023 | COT - RSPL - Yard Water Line | Passed | Water lines and tracer wires are ran to each unit. Okay to shade pipe and backfill trench. | |
| 11/07/2023 | BULD - Electrical Clearance | Passed | 9/18/23: no address tags on electrical panel, no WR receptacle for temp power, 11/7/23: ECO TEP clearance 1235 N 13TH AV UNIT 1 and 2 |
|
| 12/04/2023 | COT - RSEL - Electrical Final | Passed | ||
| 12/04/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/04/2023 | COT - RSME - Mechanical Final | Passed | ||
| 12/04/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 12/05/2023 | RSBU - Building Progress | Passed | ||
| 12/06/2023 | RSBU - Building Final | Passed | ||
| 12/05/2023 | ENGR Engineering Final | Passed |