Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/18/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
9/18/23: Unit 1: seal all penetrations through top plate (missing at ac condensation line and thermostat ), secure can light in hallway, truss at laundry room need's engineer fix (damaged), wire size not per plan calls for 12AWG in areas and 14AWG installed . Unit 2: seal all penetrations through top plate (at bathroom hot water, ac drain line, thermostat), Wire size in bedroom is not per plan (calls for 12Awg for both bedrooms and smokies but has 14AWG installed) |
| 09/19/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|