Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/28/2024
Applicant:
Daria Hopkins
Description:
SFR 235.2960 T21-M0055

Permit Reviews

Permit Number - TC-MDP-0723-01227
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Start Date Submittal Complete Date Status  
09/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/16/2024 APPROVED Review Details
05/30/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/04/2024 APPROVED Review Details
12/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/13/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01227
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Date Description Comments
06/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/04/2024 Post-Tension Inspection Report is required.
07/03/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/04/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/04/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01227
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/18/2024 COT - RSPL - Rough Soil N/A Re-inspection required 7/18/24: not under test.
07/18/2024 COT - RSPL - Sewer N/A Re-inspection required 7/18/24: not under test.
07/18/2024 COT - RSPL - Yard Water Line N/A Partial Pass 7/18/24: not under test okay to back fill has blue tracer wire
11/25/2024 ENGR Engineering Final N/A Not Ready Engineering finals, we are looking for a home to be Move in Ready.
Dumpster needs to move.
DG pile needs to be moved.
No gate.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01227
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/19/2024 COT - RSPL - Rough Soil Passed
07/19/2024 COT - RSPL - Sewer Passed
07/19/2024 COT - RSPL - Yard Water Line Passed
07/30/2024 COT - RSBU - Preslab Passed
07/30/2024 COT - RSEL - Electrical Underground Passed
07/30/2024 COT - RSEL - Grounding/Bonding Passed
07/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/15/2024 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 8/15/2024
08/15/2024 COT - RSBU - Roof Nailing Passed Corrections were made. 8/15/2024
09/10/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/10/2024
09/10/2024 COT - RSPL - Gas Pressure Test Passed
09/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made 9/13/2024
10/01/2024 COT - RSBU - Interior Shear Bracing Passed PASS 10/1/2024
11/07/2024 COT - BULD - SWG Clearance Passed 11-7-24, approved for Southwest Gas connection.
11/25/2024 COT - RSEL - Electrical Final Passed 11-25-24, electrical final approved.
11/25/2024 COT - RSEL - Outdoor Lighting Passed 11-25-24, approved.
11/25/2024 COT - RSPL - Plumbing Final Passed 11-25-24, plumbing final approved.
11/25/2024 RSBU - Building Progress Passed 11-25-24, approved.
12/02/2024 COT - RSME - Mechanical Final Passed 12-2-24, mechanical final approved.
12/02/2024 ENGR Engineering Final Passed No gate
Minor construction material in yard.
12/02/2024 RSBU - Building Final Passed 12-2-24, building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
149208 PT LOT 36 COMPLETE-2024-09-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 36 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 36 SPECIAL INSPECTION CERTIFICATE-2024-05-28_V1.PDF DOCUMENTS VIEW