Permit: TC-MDP-0723-01227
Permit Details
Apply Date:
05/28/2024
Applicant:
Daria Hopkins
Description:
SFR 235.2960 T21-M0055
Permit Reviews
Permit Number - TC-MDP-0723-01227
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/16/2024 | APPROVED |
05/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/04/2024 | APPROVED |
12/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/13/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0723-01227
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Date | Description | Comments |
---|---|---|
06/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/04/2024 | Post-Tension Inspection Report is required. | |
07/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/13/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
06/04/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01227
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 7/18/24: not under test. |
07/18/2024 | COT - RSPL - Sewer | N/A | Re-inspection required | 7/18/24: not under test. |
07/18/2024 | COT - RSPL - Yard Water Line | N/A | Partial Pass | 7/18/24: not under test okay to back fill has blue tracer wire |
11/25/2024 | ENGR Engineering Final | N/A | Not Ready | Engineering finals, we are looking for a home to be Move in Ready. Dumpster needs to move. DG pile needs to be moved. No gate. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01227
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2024 | COT - RSPL - Rough Soil | Passed | ||
07/19/2024 | COT - RSPL - Sewer | Passed | ||
07/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/30/2024 | COT - RSBU - Preslab | Passed | ||
07/30/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/30/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/30/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/15/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 8/15/2024 | |
08/15/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 8/15/2024 | |
09/10/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/10/2024 | |
09/10/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made 9/13/2024 | |
10/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | PASS 10/1/2024 | |
11/07/2024 | COT - BULD - SWG Clearance | Passed | 11-7-24, approved for Southwest Gas connection. | |
11/25/2024 | COT - RSEL - Electrical Final | Passed | 11-25-24, electrical final approved. | |
11/25/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-25-24, approved. | |
11/25/2024 | COT - RSPL - Plumbing Final | Passed | 11-25-24, plumbing final approved. | |
11/25/2024 | RSBU - Building Progress | Passed | 11-25-24, approved. | |
12/02/2024 | COT - RSME - Mechanical Final | Passed | 12-2-24, mechanical final approved. | |
12/02/2024 | ENGR Engineering Final | Passed | No gate Minor construction material in yard. |
|
12/02/2024 | RSBU - Building Final | Passed | 12-2-24, building final approved. |