Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7311 S DEMPSEY AV
Apply Date:
06/18/2025
Applicant:
Celina Rodriguez
Description:
KB Home 2467 (Model master plan TC-MDP-1124-01304)

Permit Reviews

Permit Number - TC-MDP-0625-00349
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Start Date Submittal Complete Date Status  
07/08/2025 RESTAMP - RESIDENTIAL v.1 07/09/2025 APPROVED Review Details
06/20/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/27/2025 REQUIRES RESUBMIT Review Details
07/02/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 07/08/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0625-00349
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Activity Conditions - 5
Date Name
06/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/23/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/23/2025 Post-Installed Anchor Inspection Report is required.
06/23/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/23/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0625-00349
Permit Status: Inspections complete
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Date Description Comments
06/18/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00349
Permite Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/21/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
09/02/2025 COT - RSEL - Grounding/Bonding N/A Re-inspection required 9.2.2025
Unable to verify Ufer bond at panel, provide mud ring.
10/21/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00349
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Completed Inspections - 19
Date Description Inspector Results Comments
07/15/2025 COT - RSPL - Rough Soil Passed Passed 7/5/25 ok to backfill
07/15/2025 COT - RSPL - Sewer Passed Passed 7/5/25 ok to backfill
07/15/2025 COT - RSPL - Yard Water Line Passed Passed 7/5/25 ok to backfill
07/21/2025 COT - RSBU - Preslab Passed Passed 7/21/25 ok to pour concrete
07/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 7/21/25 ok to pour concrete
07/21/2025 COT - RSEL - Electrical Underground Passed Passed 7/21/25 ok to pour concrete
08/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 8.4.25
Corrections made as requested in previous inspectors report. No additional items found.
08/04/2025 COT - RSBU - Roof Nailing Passed
08/14/2025 BULD - Electrical Clearance Passed Ready for temp power clearance ECO
08/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8.21.25
Approved
09/02/2025 COT - RSBU - Interior Shear Bracing Passed 9.2.2025
Nail schedule per plan.
10/21/2025 RSBU - Building Progress Passed
10/21/2025 ENGR Engineering Final Passed
10/21/2025 COT - RSPL - Plumbing Final Passed
10/21/2025 COT - RSME - Mechanical Final Passed
10/21/2025 COT - RSEL - Outdoor Lighting Passed
10/21/2025 COT - RSEL - Grounding/Bonding Passed
10/24/2025 COT - RSEL - Electrical Final Passed 10.24.2025
Approved, verified kitchen circuits and mud ring in garage.
10/24/2025 RSBU - Building Final Passed 10.24.2025
Approved, verified kitchen circuits and mud ring in garage.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 178 START_V2.PDF DOCUMENTS VIEW