Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Grounding/BondingĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2025 | COT - RSEL - Grounding/BondingĀ | Re-inspection required | 9.2.2025 Unable to verify Ufer bond at panel, provide mud ring. |
|
| 10/21/2025 | COT - RSEL - Grounding/BondingĀ | Passed |