Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/22/2024
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)

Permit Reviews

Permit Number - TC-MDP-0624-00738
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Start Date Submittal Complete Date Status  
08/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/28/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00738
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
Date Name
06/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/28/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/28/2024 Post-Tension Inspection Report is required.
08/28/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0624-00738
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Date Description Comments
06/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00738
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/25/2024 COT - RSPL - Rough Soil Passed 9/25/24: Plumbing underground, HCS connection and main water line per plans ok to backfill. Shading required
09/25/2024 COT - RSPL - Sewer Passed 9/25/24: Plumbing underground, HCS connection and main water line per plans ok to backfill. Shading required
09/25/2024 COT - RSPL - Yard Water Line Passed
10/03/2024 COT - RSBU - Preslab Passed
10/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/03/2024 COT - RSEL - Electrical Underground Passed
10/03/2024 COT - RSEL - Grounding/Bonding Passed
10/31/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10-31-24, listed items from previous inspection have been corrected. Roof nailing inspection approved. Okay to continue with construction.
10/31/2024 COT - RSBU - Roof Nailing Passed 10-31-24, roof nailing approved.
12/13/2024 BULD - Electrical Clearance Passed 12/13/24 TEP clearance code: ECO
12/13/2024 COT - RSPL - Gas Pressure Test Passed pass
12/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-16-24, residential intermediate inspection approved.
01/02/2025 COT - RSBU - Interior Shear Bracing Passed 1/2/25 corrections made, ok to tape
03/07/2025 COT - BULD - SWG Clearance Passed 7 Mar 25
Gas Clearance: SWG
03/13/2025 COT - RSEL - Electrical Final Passed 13 March 25
pass
03/13/2025 RSBU - Building Final Passed
03/13/2025 COT - RSEL - Outdoor Lighting Passed
03/13/2025 COT - RSME - Mechanical Final Passed
03/13/2025 COT - RSPL - Plumbing Final Passed
03/25/2025 ENGR Engineering Final Passed CO Ready
Right side of garage, painters cleaned out in the rocks, this practice needs to stop. I will check it on my next trip out to be sure it has been cleaned up.
03/25/2025 RSBU - Building Progress Passed passed 3/25/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-08-22_V1.PDF DOCUMENTS VIEW