Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
914 E 38TH ST
Address NEW:
914 E 38TH ST
Apply Date:
07/17/2023
Applicant:
Description:
SFR VALD00122 T22-M0013

Permit Reviews

Permit Number - TC-MDP-0623-01165
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
Start Date Submittal Complete Date Status  
07/18/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/19/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01165
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
Date Description Comments
06/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/19/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01165
Permit Description: SFR VALD00122 T22-M0013
Total Completed Inspections - 18
Date Description Inspector Results Comments
10/10/2023 COT - RSPL - Rough Soil Passed Approved. Okay to backfill. Shading is required. 10/10/2023
10/10/2023 COT - RSPL - Yard Water Line Passed Approved. Okay to backfill. Shading is required. 10/10/2023
10/25/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/25/2023 COT - RSBU - Preslab Passed
10/25/2023 COT - RSEL - Grounding/Bonding Passed
11/21/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/21/2023 COT - RSBU - Roof Nailing Passed
12/15/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/15/2023 RSBU - Building Progress Passed
02/20/2024 BULD - Electrical Clearance Passed Approved new service, ECO Clearance to TEP is required
03/08/2024 COT - RSPL - Sewer Passed 3/8/24: ok to backfill.
03/12/2024 ENGR Engineering Final Passed Spoke to Marco Yepiz will need to backfill old septic tank opening located on the West center side yard area, Marco said he will have this completed tomorrow.

The City Of Tucson will assume (NO) Liability for the exposed concrete septic Tank located in the side yard of(914 E 38st.)
03/19/2024 COT - RSEL - Electrical Underground Passed
03/21/2024 COT - RSEL - Outdoor Lighting Passed
03/21/2024 COT - RSPL - Plumbing Final Passed
04/05/2024 COT - RSEL - Electrical Final Passed
04/05/2024 COT - RSME - Mechanical Final Passed
04/05/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
38TH SITE PLAN_V1.PDF DOCUMENTS VIEW