Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
02/05/2024
Applicant:
Dana Petty
Description:
SFR 230.2690 T21-M0027

Permit Reviews

Permit Number - TC-MDP-0623-01134
Permit Status: Issued
Permit Description: SFR 230.2690 T21-M0027
Start Date Submittal Complete Date Status  
08/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/15/2024 APPROVED Review Details
02/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/13/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01134
Permit Status: Issued
Permit Description: SFR 230.2690 T21-M0027
Date Description Comments
02/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/13/2024 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/13/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0623-01134
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/23/2024 BULD - Electrical Clearance N/A Not Ready 8/23/24: not ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0623-01134
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 13
Date Description Inspector Results Comments
06/24/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 6/24/2024
06/24/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 6/24/2024
06/24/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 6/24/2024
07/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/02/2024 COT - RSBU - Preslab Passed
07/02/2024 COT - RSEL - Electrical Underground Passed
07/02/2024 COT - RSEL - Grounding/Bonding Passed
07/31/2024 COT - RSBU - Roof Nailing Passed
08/01/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/28/2024 COT - RSPL - Gas Pressure Test Passed
08/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Add receptacle in kitchen near stove to be within the 2'. Missing clean out in kitchen pantry. Add nail plates to electrical lines that are less than an 1 1/4". Block floor space at laundry room. Add supports for gas lines and secure in place. Move over electrical lines off gusset plates. Add foam to pex line in bathroom downstairs near can light. Leak at clean out kitchen sink. Receptacle in bedroom 2 exceeding 12'. Seal all exterior penetrations through lath. Along with tear first bedroom above header. Duct above loft area and fresh air intake are filled with water. Need to be replaced. Add strap along the bottom plates that's been over notched near refrigerant lines. Tape seams at hard ducts. Move smokie over to 6" from wall first floor outside of bedroom. 8/28/2024

8/30/24: passed
09/04/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/4/2024
09/11/2024 COT - RSBU - Interior Shear Bracing Passed Passed shear wall inspection 9/11/2024

Documents

File Name Document Type  
148621 PT LOT 39 COMPLETE-2024-08-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 39 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 39 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 39 SPECIAL INSPECTION CERTIFICATE-2024-02-05_V1.PDF DOCUMENTS VIEW