Permit: TC-MDP-0525-00317
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
466 W WYOMING ST
Address NEW:
466 W WYOMING ST
Apply Date:
05/31/2025
Applicant:
Adalberto Diaz
Description:
LUMO III New SFR (Model master plan TC-MDP-0323-00824)
Permit Reviews
Permit Number - TC-MDP-0525-00317
Permit Status: Complete
Permit Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 09/22/2025 | APPROVED |
| 06/02/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 06/18/2025 | REQUIRES RESUBMIT |
| 09/22/2025 | ADMINISTRATIVE v.1 | 09/22/2025 | REQUIRES RESUBMIT |
| 12/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/16/2025 | APPROVED |
| 10/08/2025 | ADMINISTRATIVE v.3 | 10/08/2025 | APPROVED |
| 10/08/2025 | ADMINISTRATIVE v.2 | 10/08/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0525-00317
Permit Status: Complete
Permit Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
| Date | Description | Comments |
|---|---|---|
| 05/30/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/30/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/12/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00317
Permite Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 12-12-25: add nails at exterior 6" o.c. Along edges/splices- sheathing above exterior entryway and at marked locations, remove or properly nail any nails that are not flush at exterior sheathing, add shot pins within 6" at the ends of each plate. |
| 12/12/2025 | COT - RSPL - Sewer | N/A | Canceled | 12-12-25: canceled by contractor. |
| 12/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 12/23/2025 Add smoke detector in hallway, land the outlet and switch circuit to main panel board in dining room, add all light boxes, add exhaust fan bushing to all boxes, brace air register in hallway, move outlet receptacle within 6ft of door in main bedroom. Add fire foam to penetrations. |
| 06/15/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/15/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00317
Permit Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2025 | COT - RSPL - Rough Soil | Passed | Passed 10/30/25 ok to backfill | |
| 10/30/2025 | COT - RSEL - Electrical Underground | Passed | Passed 10/30/25 ok to backfill | |
| 11/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-13-25: excavation/reinforcement, preslab verified per plans-okay for concrete placement. | |
| 11/13/2025 | COT - RSBU - Preslab | Passed | 11-13-25: excavation/reinforcement, preslab verified per plans-okay for concrete placement. | |
| 12/12/2025 | COT - RSBU - Roof Nailing | Passed | 12-12-25: okay to dry-in roof. | |
| 12/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/16/2025 All corrections made from prior 12/12/25 inspection. |
|
| 12/23/2025 | COT - RSEL - Grounding/Bonding | Passed | 12/23/2025 Bonded UFER to main service panel with acorn. |
|
| 12/23/2025 | COT - RSPL - Sewer | Passed | 12/23/2025 Under test and holding with green tracer wire to HCS in proper trench depth - okay to backfill with shading materials. |
|
| 12/23/2025 | COT - RSPL - Yard Water Line | Passed | 12/23/2025 Under test and holding with blue tracer wire to meter in proper trench depth - okay to backfill with shading materials. |
|
| 12/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/24/2025 All corrections made to yesterday's inspection. |
|
| 01/05/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/14/2026 | BULD - Electrical Clearance | Passed | 01/14/2026 Clearance to TEP ECO. |
|
| 06/15/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/15/2026 | RSBU - Building Progress | Passed | ||
| 06/15/2026 | RSBU - Building Final | Passed | ||
| 06/15/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/15/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/15/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/18/2026 | ENGR Engineering Final | Passed |