Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
913 E 36TH ST
Address NEW:
913 E 36TH ST
Apply Date:
09/04/2025
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0525-00310
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
09/26/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 10/30/2025 APPROVED Review Details
10/30/2025 ADMINISTRATIVE v.1 10/30/2025 REQUIRES RESUBMIT Review Details
09/05/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/19/2025 REQUIRES RESUBMIT Review Details
11/03/2025 ADMINISTRATIVE v.2 11/03/2025 APPROVED Review Details
10/30/2025 RESTAMP - RESIDENTIAL v.1 10/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0525-00310
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Activity Conditions - 2
Date Name
10/29/2025 This project requires a Right-of-Way (ROW) permit issued by Department of Transportation and Mobility (DTM) prior to working in the public Right-of-Way.
10/30/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-MDP-0525-00310
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
10/30/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
05/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/28/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/28/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/19/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0525-00310
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/24/2025 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Partial Pass Partial pass. 5/8 at party wall. 11/24/2025
02/09/2026 COT - RSBU - Interior Shear Bracing N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0525-00310
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
Date Description Inspector Results Comments
11/07/2025 COT - RSPL - Rough Soil Passed
11/10/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
11/10/2025 COT - RSBU - Preslab Passed
11/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/24/2025 COT - RSBU - Roof Nailing Passed
11/28/2025 BULD - Electrical Clearance Passed 11/28/2025 clearance for TEP ECO. UNITS 1 AND 2.
11/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11/28/2025 approved. Corrections have been made.
11/28/2025 COT - RSEL - Grounding/Bonding Passed 11/28/2025 approved. Corrections have been made.
01/08/2026 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 1/8/2026
02/09/2026 COT - RSBU - Firewall/Fire Barrier/Firestop Passed 2.9.26
Approved
02/09/2026 COT - RSEL - Electrical Final Passed 2.9.26
Approved
02/09/2026 COT - RSEL - Electrical Underground Passed 2.9.26
Approved
02/09/2026 COT - RSEL - Outdoor Lighting Passed 2.9.26
Approved
02/09/2026 COT - RSME - Mechanical Final Passed 2.9.26
Approved
02/09/2026 COT - RSPL - Plumbing Final Passed 2.9.26
Approved
02/09/2026 COT - RSPL - Yard Water Line Passed 2.9.26
Approved
02/09/2026 ENGR Engineering Final Passed
02/09/2026 RSBU - Building Final Passed 2.9.26
Approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SEWERCONNECTIONPERMIT_20251031_200355_V1.PDF DOCUMENTS VIEW
CONS-36 CORRECTIONS_V2.PDF DOCUMENTS VIEW
TC-MDP-0525-00310 LETTER_V1.PDF DOCUMENTS VIEW