Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/19/2025
Applicant:
Catherine Wilson
Description:
ADU MODEL PLAN (Master model plan TC-MDP-0325-00177)

Permit Reviews

Permit Number - TC-MDP-0525-00305
Permit Status: Complete
Permit Description: ADU MODEL PLAN (Master model plan TC-MDP-0325-00177)
Start Date Submittal Complete Date Status  
05/21/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 05/21/2025 REQUIRES RESUBMIT Review Details
07/31/2025 RESTAMP - RESIDENTIAL v.1 07/31/2025 REQUIRES RESUBMIT Review Details
05/23/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 06/16/2025 REQUIRES RESUBMIT Review Details
08/06/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 08/19/2025 APPROVED Review Details
07/02/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 07/17/2025 REQUIRES RESUBMIT Review Details
07/18/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 07/31/2025 APPROVED Review Details
12/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2025 APPROVED Review Details
06/17/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 07/01/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0525-00305
Permit Status: Complete
Permit Description: ADU MODEL PLAN (Master model plan TC-MDP-0325-00177)
Date Description Comments
08/06/2025 The permit submitted shows to be for an ADU. The plan lists unit 2 but the location of this permit does not include unit 2 and pre issuance addressing condition has been placed on permit. Please contact Pima County Addressing at addressing@pima.gov or 520-724-9512 to verify and add the unit. Note, you'll need to submit, to this permit, a change of address request to properly update the permit location.
05/19/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/10/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/05/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0525-00305
Permit Description: ADU MODEL PLAN (Master model plan TC-MDP-0325-00177)
Total Completed Inspections - 17
Date Description Inspector Results Comments
09/15/2025 COT - RSPL - Rough Soil Passed Passed 9/15/25 ok to backfill
09/22/2025 COT - RSBU - Preslab Passed 9.22.25
rebar verified per plans
depth of footers verified
cross rebar verified
compaction good

APPROVED - OK TO POUR
09/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 9.22.25
rebar verified per plans
depth of footers verified
cross rebar verified
compaction good

APPROVED - OK TO POUR
10/10/2025 COT - RSBU - Roof Nailing Passed
10/10/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 11/3/25
11/21/2025 BULD - Electrical Clearance Passed 11.21.25
Approved for ECO
01/23/2026 COT - RSPL - Yard Water Line Passed O1/23/2026
Approved and holding under test with tracer wire in trench, separated 12" above ABS sewer line - ok to backfill with shading materials.
01/23/2026 RSPL - Plumbing Progress Passed O1/23/2026
Sewer connected to HCS. Approved and holding under test with green tracer wire in trench with cleanout, separated 12" below main water line - ok to backfill with shading materials.
01/30/2026 ENGR Engineering Final Passed 1/30/26 - Site is complete in accordance with approved plans.
02/03/2026 COT - RSEL - Electrical Final Passed
02/03/2026 COT - RSEL - Electrical Underground Passed
02/03/2026 COT - RSEL - Grounding/Bonding Passed
02/03/2026 COT - RSEL - Outdoor Lighting Passed
02/03/2026 COT - RSME - Mechanical Final Passed
02/03/2026 COT - RSPL - Plumbing Final Passed
02/03/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
SEWER CONNECTION PERMIT 7641 TORONTO-2025-12-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7641 E TRONTO ST REV 4_V6.PDF DOCUMENTS VIEW