Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/03/2024
Applicant:
Dana Petty
Description:
SFR 230.2690 T21-M0027

Permit Reviews

Permit Number - TC-MDP-0524-00682
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Start Date Submittal Complete Date Status  
06/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/05/2024 APPROVED Review Details
09/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/17/2024 APPROVED Review Details
12/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/23/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00682
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Date Description Comments
06/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/04/2024 Post-Tension Inspection Report is required.
05/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/04/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00682
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required All other corrections were made. Provide DWV throughout 2nd floor. 9/19/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00682
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/23/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 7/23/2024
07/24/2024 COT - RSPL - Sewer Passed Okay to backfill shading required. 7/24/2024
07/24/2024 COT - RSPL - Rough Soil Passed Okay to backfill shading required. 7/24/2024
07/31/2024 COT - RSEL - Electrical Underground Passed
07/31/2024 COT - RSEL - Grounding/Bonding Passed
08/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 8/2/2024 approved. Corrections were made.
08/02/2024 COT - RSBU - Preslab Passed 8/2/2024 approved. Corrections were made.
08/23/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/23/2024 COT - RSBU - Roof Nailing Passed
09/19/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/19/2024
09/19/2024 COT - RSPL - Gas Pressure Test Passed
09/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. Corrections wee made. 9/20/2024
10/08/2024 COT - RSBU - Interior Shear Bracing Passed PASS 10/8/24
11/13/2024 COT - BULD - SWG Clearance Passed 11-13-24, approved for Southwest Gas connection.
12/05/2024 ENGR Engineering Final Passed Trees still need to be tied off.
Construction materials need to be removed from site.
Emphasis is on "HOME NEEDS TO BE MOVE IN READY" and complete.
12/06/2024 COT - RSEL - Electrical Final Passed 12-6-24, electrical, outdoor lighting, plumbing, mechanical, building final approved.
12/06/2024 COT - RSEL - Outdoor Lighting Passed 12-6-24, electrical, outdoor lighting, plumbing, mechanical, building final approved.
12/06/2024 COT - RSME - Mechanical Final Passed 12-6-24, electrical, outdoor lighting, plumbing, mechanical, building final approved.
12/06/2024 COT - RSPL - Plumbing Final Passed 12-6-24, electrical, outdoor lighting, plumbing, mechanical, building final approved.
12/06/2024 RSBU - Building Final Passed 12-6-24, electrical, outdoor lighting, plumbing, mechanical, building final approved.
12/06/2024 RSBU - Building Progress Passed 12-6-24, electrical, outdoor lighting, plumbing, mechanical, building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
149230 PT LOT 45 COMPLETE-2024-09-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 45 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 45 SPECIAL INSPECTION CERTIFICATE-2024-06-03_V1.PDF DOCUMENTS VIEW