Permit: TC-MDP-0524-00680
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6842 E PASEO DE VILLALOBOS
Address NEW:
6842 E PASEO DE VILLALOBOS
Apply Date:
06/03/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2690 T21-M0027
Permit Reviews
Permit Number - TC-MDP-0524-00680
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/05/2024 | APPROVED |
| 10/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/04/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00680
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Date | Description | Comments |
|---|---|---|
| 06/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/04/2024 | Post-Tension Inspection Report is required. | |
| 05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00680
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | Partial pass. Pending loose shear wall at garage area left side. 1st sheet. Add h25 clip at truss in garage entry. 9/13/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00680
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/9/2024 | |
| 08/12/2024 | COT - RSPL - Rough Soil | Passed | ||
| 08/12/2024 | COT - RSPL - Sewer | Passed | ||
| 08/19/2024 | COT - RSBU - Preslab | Passed | ||
| 08/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 08/19/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/13/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/07/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/07/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/7/2024 | |
| 10/14/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. 10/14/2024 | |
| 10/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10-28-24, interior shear wall inspection approved. Okay to tape & texture. | |
| 12/04/2024 | COT - BULD - SWG Clearance | Passed | 12-4-24, approved for Southwest gas connection. | |
| 12/12/2024 | COT - RSEL - Electrical Final | Passed | Passed final 12/12/24 | |
| 12/12/2024 | COT - RSEL - Outdoor Lighting | Passed | Passed final 12/12/24 | |
| 12/12/2024 | COT - RSME - Mechanical Final | Passed | Passed final 12/12/24 | |
| 12/12/2024 | COT - RSPL - Plumbing Final | Passed | Passed final 12/12/24 | |
| 12/12/2024 | ENGR Engineering Final | Passed | ||
| 12/12/2024 | RSBU - Building Final | Passed | Passed final 12/12/24 | |
| 12/12/2024 | RSBU - Building Progress | Passed | Passed final 12/12/24 |