Permit: TC-MDP-0524-00654
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
3565 E NEBRASKA SV
Address NEW:
3565 E NEBRASKA SV
Apply Date:
05/22/2024
Applicant:
Justin Obrien
Description:
Roca Realty model L 1-12
Permit Reviews
Permit Number - TC-MDP-0524-00654
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/03/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 06/20/2024 | APPROVED |
| 08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/15/2024 | APPROVED |
| 05/30/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 05/30/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0524-00654
Permit Status: Complete
Permit Description: Roca Realty model L 1-12
| Date | Description | Comments |
|---|---|---|
| 06/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00654
Permite Description: Roca Realty model L 1-12
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | Site does not use gas |
| 02/13/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | no electrical underground |
| 02/13/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00654
Permit Description: Roca Realty model L 1-12
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2024 | COT - RSPL - Rough Soil | Passed | 7/11/24: plumbing underground per plans ok to proceed. Shading required. | |
| 07/15/2024 | COT - RSBU - Preslab | Passed | ||
| 07/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Corrections were made. 8/19/2024 | |
| 08/19/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 8/19/2024 | |
| 08/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/27/2024 | |
| 08/29/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/29/2024 | |
| 09/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/15/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/15/2024 | |
| 10/22/2024 | COT - RSPL - Sewer | Passed | 10/22/24 corrections made | |
| 02/06/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/6/25 | |
| 02/07/2025 | COT - RSME - Mechanical Final | Passed | 2/7/25 corrections made | |
| 02/07/2025 | COT - RSPL - Plumbing Final | Passed | 2/7/25 corrections made | |
| 02/07/2025 | RSBU - Building Final | Passed | 2/7/25 corrections made | |
| 02/13/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 02/13/2025 | RSBU - Building Progress | Passed | Passed final 2/13/25 | |
| 02/13/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/13/25 CLEARANCE ECO |