Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9629 E HARKES DR
Address NEW:
9629 E HARKES DR
Apply Date:
05/28/2024
Applicant:
Brianna Quiroz
Description:
Big Bend Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-0524-00648
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Start Date Submittal Complete Date Status  
04/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/04/2025 APPROVED Review Details
05/30/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/03/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00648
Permit Status: Complete
Permit Description: Big Bend Model Plan La Escalera
Date Description Comments
06/03/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/03/2024 Post-Tension Inspection Report is required.
05/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/03/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00648
Permite Description: Big Bend Model Plan La Escalera
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/09/2024 COT - BULD - SWG Clearance N/A Not Applicable 12-9-24, not applicable.
12/09/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable 12-9-24, not applicable.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00648
Permit Description: Big Bend Model Plan La Escalera
Total Completed Inspections - 20
Date Description Inspector Results Comments
08/07/2024 COT - RSEL - Electrical Underground Passed Electrical underground for kitchen island is complete. Okay to shade conduit and backfill trench.
08/07/2024 COT - RSPL - Backwater Valve Passed 8/7/24: Backwater valve is properly installed.
08/07/2024 COT - RSPL - Rough Soil Passed 8/7/24: Underground plumbing is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches.
08/07/2024 COT - RSPL - Yard Water Line Passed 8/7/24: Main water line is trenched and installed from meter box to house. Water line is under 60psi air pressure until meter can be installed.
08/14/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 8/14/2024
08/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/20/2024 COT - RSBU - Preslab Passed
08/20/2024 COT - RSEL - Grounding/Bonding Passed
11/08/2024 BULD - Electrical Clearance Passed ECO CLEARANCE ISSUED.
12/31/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12/31/24 corrections made
12/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections made 12/31/24
12/31/2024 COT - RSBU - Roof Nailing Passed 12/31/24 corrections made
01/23/2025 COT - RSBU - Interior Shear Bracing Passed 1/23/25 corrections we made.
04/09/2025 COT - RSEL - Outdoor Lighting Passed 4-9-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved.
04/09/2025 COT - RSEL - Electrical Final Passed 4-9-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved.
04/09/2025 COT - RSME - Mechanical Final Passed 4-9-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved.
04/09/2025 COT - RSPL - Plumbing Final Passed 4-9-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved.
04/09/2025 ENGR Engineering Final Passed CO READY
04/09/2025 RSBU - Building Final Passed 4-9-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved.
04/09/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 64 SIC-2025-04-03_V1.PDF DOCUMENTS VIEW
USE - PATTISON SOILS REPORT 1.25.2022_V1.PDF DOCUMENTS VIEW
Z160 BIG BEND- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 64 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 64 SIC-2024-05-28_V1.PDF DOCUMENTS VIEW