Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
05/20/2024
Applicant:
Brandon Kempel
Description:
SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)

Permit Reviews

Permit Number - TC-MDP-0524-00630
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Start Date Submittal Complete Date Status  
06/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/21/2024 APPROVED Review Details
05/20/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/24/2024 APPROVED Review Details
01/30/2025 SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 02/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00630
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Outstanding Activity Conditions - 6
Date Name
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/22/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/22/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/22/2024 Post-Tension Inspection Report is required.
05/22/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00630
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Date Description Comments
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/22/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0524-00630
Permite Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/20/2024 ENGR Engineering Final N/A Canceled

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0524-00630
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Completed Inspections - 20
Date Description Inspector Results Comments
07/01/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 7/1/2024
07/01/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 7/1/2024
07/01/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 7/1/2024
07/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/11/2024 COT - RSBU - Preslab Passed
07/11/2024 COT - RSEL - Electrical Underground Passed
07/11/2024 COT - RSEL - Grounding/Bonding Passed
08/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 8/14/24: Red heads have been installed where needed. Added missing studs at master bedroom girder truss. Rough framing for exterior and interior walls is complete. Okay to proceed with rough-in work.
08/14/2024 COT - RSBU - Roof Nailing Passed 8/14/24: Red heads have been installed where needed. Added missing studs at master bedroom girder truss. Rough framing for exterior and interior walls is complete. Roof framing and sheathing is properly nailed off with H2.5 clips properly secured to trusses and top plate. Okay to proceed with rough-in work.
09/18/2024 BULD - Electrical Clearance Passed TEP ECO
09/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/18/2024 COT - RSPL - Gas Pressure Test Passed
10/16/2024 COT - RSBU - Interior Shear Bracing Passed Drywall secured to studs per plan requirements. Okay to proceed with tape, texture, and paint.
12/12/2024 COT - BULD - SWG Clearance Passed 12-12-24, sediment trap on waterbed heater heater verified together with all shutoff valves on required appliances. Okay for Southwest Gas Company to install meter.
12/19/2024 COT - RSME - Mechanical Final Passed 12-19-24, mechanical final approved.
12/20/2024 COT - RSEL - Electrical Final Passed Corrections made 12/20/24
12/23/2024 COT - RSEL - Outdoor Lighting Passed Corrections made 12/20/24
12/20/2024 COT - RSPL - Plumbing Final Passed Corrections made 12/20/24
12/20/2024 RSBU - Building Final Passed Corrections made 12/20/24
01/03/2025 ENGR Engineering Final Passed Ensure site is completely cleaned. Paint overspray and paint clean out in back yard must be cleaned up. Debris in backyard must be cleaned..

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
2_SITEPLAN_V1.PDF DOCUMENTS VIEW
F55I APPROVED TRUSS CALCS 7-29-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-05-20_V1.PDF DOCUMENTS VIEW