Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00630
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
12750 E TORTOISE CANYON LN
Address NEW:
12750 E TORTOISE CANYON LN
Apply Date:
05/20/2024
Applicant:
Brandon Kempel
Description:
SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Permit Reviews
Permit Number - TC-MDP-0524-00630
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
| 05/20/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/24/2024 | APPROVED |
| 01/30/2025 | SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 | 02/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00630
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 05/22/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 05/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 05/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 05/22/2024 | Post-Tension Inspection Report is required. |
| 05/22/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00630
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
| Date | Description | Comments |
|---|---|---|
| 05/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/22/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0524-00630
Permite Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2024 | ENGR Engineering Final | N/A | Canceled |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0524-00630
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 7/1/2024 | |
| 07/01/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 7/1/2024 | |
| 07/01/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/1/2024 | |
| 07/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/11/2024 | COT - RSBU - Preslab | Passed | ||
| 07/11/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/11/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/14/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8/14/24: Red heads have been installed where needed. Added missing studs at master bedroom girder truss. Rough framing for exterior and interior walls is complete. Okay to proceed with rough-in work. | |
| 08/14/2024 | COT - RSBU - Roof Nailing | Passed | 8/14/24: Red heads have been installed where needed. Added missing studs at master bedroom girder truss. Rough framing for exterior and interior walls is complete. Roof framing and sheathing is properly nailed off with H2.5 clips properly secured to trusses and top plate. Okay to proceed with rough-in work. | |
| 09/18/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 09/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall secured to studs per plan requirements. Okay to proceed with tape, texture, and paint. | |
| 12/12/2024 | COT - BULD - SWG Clearance | Passed | 12-12-24, sediment trap on waterbed heater heater verified together with all shutoff valves on required appliances. Okay for Southwest Gas Company to install meter. | |
| 12/19/2024 | COT - RSME - Mechanical Final | Passed | 12-19-24, mechanical final approved. | |
| 12/20/2024 | COT - RSEL - Electrical Final | Passed | Corrections made 12/20/24 | |
| 12/23/2024 | COT - RSEL - Outdoor Lighting | Passed | Corrections made 12/20/24 | |
| 12/20/2024 | COT - RSPL - Plumbing Final | Passed | Corrections made 12/20/24 | |
| 12/20/2024 | RSBU - Building Final | Passed | Corrections made 12/20/24 | |
| 01/03/2025 | ENGR Engineering Final | Passed | Ensure site is completely cleaned. Paint overspray and paint clean out in back yard must be cleaned up. Debris in backyard must be cleaned.. |