Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2025 | ENGR Engineering Final | Passed | Ensure site is completely cleaned. Paint overspray and paint clean out in back yard must be cleaned up. Debris in backyard must be cleaned.. | |
| 12/19/2024 | ENGR Engineering Final | Not Ready | Clean outs are not glued Gate strike side is not right |
|
| 12/20/2024 | ENGR Engineering Final | Canceled |