Permit: TC-MDP-0524-00597
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1124 E MILTON RD
Address NEW:
1124 E MILTON RD
Apply Date:
05/03/2024
Applicant:
Carlos Brown
Description:
Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Permit Reviews
Permit Number - TC-MDP-0524-00597
Permit Status: Complete
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/14/2024 | RESTAMP - RESIDENTIAL v.1 | 11/27/2024 | REQUIRES RESUBMIT |
| 01/31/2025 | RESTAMP - RESIDENTIAL v.2 | 02/18/2025 | APPROVED |
| 11/07/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 11/14/2024 | APPROVED |
| 01/17/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/31/2025 | APPROVED |
| 05/10/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 05/28/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0524-00597
Permit Status: Complete
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Date | Description | Comments |
|---|---|---|
| 01/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00597
Permite Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 05/06/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 5-6-25, not applicable. |
| 05/06/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 5-6-25, not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00597
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2025 | COT - RSPL - Rough Soil | Passed | ||
| 03/27/2025 | COT - RSBU - Preslab | Passed | ||
| 03/27/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/01/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/01/2025 | COT - RSPL - Sewer | Passed | ||
| 04/04/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved. Corrections were made. 4/4/2025 | |
| 04/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/16/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 04/16/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 04/17/2025 | BULD - Electrical Clearance | Passed | 17 April 25 TEP CLEARANCE : ECO |
|
| 05/06/2025 | COT - RSEL - Electrical Final | Passed | 5-6-25, electrical final approved. | |
| 05/06/2025 | COT - RSEL - Grounding/Bonding | Passed | 5-6-25, grounding/bonding approved. | |
| 05/06/2025 | COT - RSEL - Outdoor Lighting | Passed | 5-6-25, outdoor lighting approved. | |
| 05/06/2025 | COT - RSME - Mechanical Final | Passed | 5-6-25, mechanical, plumbing, electrical, and building final approved. | |
| 05/06/2025 | COT - RSPL - Plumbing Final | Passed | 5-6-25, mechanical, plumbing, electrical, and building final approved. | |
| 05/06/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 05/06/2025 | RSBU - Building Final | Passed | 5-6-25, mechanical, plumbing, electrical, and building final approved. | |
| 05/06/2025 | RSBU - Building Progress | Passed |