Permit: TC-MDP-0524-00592
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9126 E WHITE BLUFF CT
Address NEW:
9126 E WHITE BLUFF CT
Apply Date:
10/09/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2212-230 T22-M0018
Permit Reviews
Permit Number - TC-MDP-0524-00592
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 11/12/2024 | APPROVED |
| 10/10/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/10/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00592
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 11/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 11/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 11/01/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0524-00592
Permit Status: Inspections complete
Permit Description: SFR BT2212-230 T22-M0018
| Date | Description | Comments |
|---|---|---|
| 10/10/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00592
Permit Description: SFR BT2212-230 T22-M0018
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2024 | COT - RSPL - Rough Soil | Passed | 11-14-24, underground plumbing, sewer connection verified as per approved plans. Okay to backfill-provide shading. | |
| 11/14/2024 | COT - RSPL - Backwater Valve | Passed | 11-14-24, underground plumbing, sewer connection , main water line, backwater valve, verified as per approved plans. Okay to backfill-provide shading. | |
| 11/14/2024 | COT - RSPL - Yard Water Line | Passed | 11-14-24, underground plumbing, sewer connection , main water line, backwater valve, verified as per approved plans. Okay to backfill-provide shading. | |
| 11/14/2024 | COT - RSPL - Sewer | Passed | 11-14-24, underground plumbing, sewer connection , main water line, backwater valve, verified as per approved plans. Okay to backfill-provide shading. | |
| 11/21/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/21/2024 | COT - RSEL - Electrical Underground | Passed | N/a no kitchen island. 11/21/2024 | |
| 11/21/2024 | COT - RSBU - Preslab | Passed | ||
| 11/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/12/2024 | COT - RSBU - Roof Nailing | Passed | 12-12-24, roof nailing approved. | |
| 12/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Pass | |
| 01/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in work is complete. Okay to proceed with installation of insulation and drywall. | |
| 01/08/2025 | COT - RSPL - Gas Pressure Test | Passed | Gas line is installed and under 15psi of air pressure with no leaks. Okay to proceed with other work. | |
| 01/08/2025 | BULD - Electrical Clearance | Passed | ECO Clearance issued to TEP for 9126 E White Bluff Ct. | |
| 01/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/22/25 pass | |
| 02/26/2025 | COT - BULD - SWG Clearance | Passed | 02/26/25 Southwest gas: SWG |
|
| 02/26/2025 | RSBU - Building Progress | Passed | ||
| 03/20/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/20/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/20/2025 | ENGR Engineering Final | Passed | ||
| 03/25/2025 | COT - RSEL - Electrical Final | Passed | 3/25/25 Corrections made | |
| 03/25/2025 | COT - RSME - Mechanical Final | Passed | 3/25/25 Corrections made | |
| 03/25/2025 | RSBU - Building Final | Passed | 3/25/25 Corrections made |