Permit: TC-MDP-0524-00587
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6463 S AMBARELLA DR
Address NEW:
6463 S AMBARELLA DR
Apply Date:
05/20/2024
Applicant:
Celina Rodriguez
Description:
VC 1262-130
Permit Reviews
Permit Number - TC-MDP-0524-00587
Permit Status: Inspections complete
Permit Description: VC 1262-130
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/20/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00587
Permit Status: Inspections complete
Permit Description: VC 1262-130
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/02/2024 | Post-Tension Inspection Report is required. |
| 05/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 05/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 05/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 05/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 05/22/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00587
Permit Status: Inspections complete
Permit Description: VC 1262-130
| Date | Description | Comments |
|---|---|---|
| 05/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00587
Permit Description: VC 1262-130
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2024 | COT - RSPL - Rough Soil | Passed | ||
| 06/14/2024 | COT - RSPL - Sewer | Passed | ||
| 06/14/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/25/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/26/2024 | COT - RSBU - Preslab | Passed | ||
| 06/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Corrections were made. 6/26/2024 | |
| 07/31/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/31/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/16/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/16/2024 | |
| 08/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. 8/28/2024 | |
| 08/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/08/2024 | COT - BULD - SWG Clearance | Passed | PASS 10/8/24. Southwest gas clearance | |
| 10/25/2024 | COT - RSEL - Electrical Final | Passed | 10-25-24, electrical final approved. | |
| 10/25/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-25-24, outdoor lighting final approved. | |
| 10/25/2024 | COT - RSME - Mechanical Final | Passed | 10-25-24, mechanical final approved. | |
| 10/25/2024 | COT - RSPL - Plumbing Final | Passed | 10-25-24, plumbing final approved. | |
| 10/25/2024 | RSBU - Building Final | Passed | 10-25-24, building final inspection approved. | |
| 10/25/2024 | RSBU - Building Progress | Passed | ||
| 10/30/2024 | ENGR Engineering Final | Passed |