Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2024 | ENGR Engineering Final | Not Ready | Finish irrigation, landscape, ground cover installation. Install rip-rap/erosion control adjacent to front walkway. | |
| 10/30/2024 | ENGR Engineering Final | Passed |