Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6113 E FALCONRY TR
Apply Date:
05/01/2024
Applicant:
Alonzo Martinez
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-0524-00567
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
06/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2025 APPROVED Review Details
05/02/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00567
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date Name
05/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0524-00567
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
05/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.
05/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00567
Permite Description: Blackhawk H30A Model Plan
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/11/2025 ENGR Engineering Final N/A Not Ready Collar of sewer clean is loose. Collar must be glued down. Also dumpster in front of house needs to be moved.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00567
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/01/2025 BULD - Electrical Clearance Passed 5/1/25: ECO
05/01/2025 COT - RSEL - Electrical Underground Passed
05/02/2025 COT - RSPL - Rough Soil Passed 5/1/25: plumbing underground/ sewer/ MWL per plan and under pressure, backfill material must be present on site and trenches shall be free from rocks and debris.
5/2/25: passed. SHADING REQUIRED
05/02/2025 COT - RSPL - Sewer Passed 5/1/25: plumbing underground/ sewer/ MWL per plan and under pressure, backfill material must be present on site and trenches shall be free from rocks and debris.
5/2/25: passed. SHADING REQUIRED
05/02/2025 COT - RSPL - Yard Water Line Passed 5/1/25: plumbing underground/ sewer/ MWL per plan and under pressure, backfill material must be present on site and trenches shall be free from rocks and debris.
5/2/25: passed. SHADING REQUIRED
05/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/09/2025 COT - RSBU - Preslab Passed
05/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/16/2025 COT - RSBU - Roof Nailing Passed
05/30/2025 COT - RSEL - Grounding/Bonding Passed 5-30-25, approved.
05/30/2025 COT - RSPL - Gas Pressure Test Passed 5-30-25, gas pressure test approved.
06/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6-6-25: intermediates approved. Okay to continue with construction.
06/13/2025 COT - RSBU - Interior Shear Bracing Passed 6-13-25; interior shear wall approved.
08/01/2025 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the meter set
08/11/2025 RSBU - Building Progress Passed
08/13/2025 COT - RSEL - Electrical Final Passed
08/13/2025 COT - RSEL - Outdoor Lighting Passed
08/13/2025 COT - RSME - Mechanical Final Passed 8/13/25
Correction made.
08/13/2025 COT - RSPL - Plumbing Final Passed 8/13/25
All findings corrected.
08/13/2025 ENGR Engineering Final Passed
08/13/2025 RSBU - Building Final Passed 8/13/25
Correction made.

Documents

File Name Document Type  
BHK 133 SIC-2025-06-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 133 D1_V1.PDF DOCUMENTS VIEW
BHK 133 SIC-2024-05-01_V1.PDF DOCUMENTS VIEW