Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2025 | RSBU - Building Final | Re-inspection required | 8.11.25 Insulate water lines at water heater (Any line 3/4 or greater must be insulated per irc, IPC, and iecc. Correct GFCI by panel |
|
| 08/13/2025 | RSBU - Building Final | Passed | 8/13/25 Correction made. |