Permit: TC-MDP-0524-00556
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6089 E FALCONRY TR
Address NEW:
6089 E FALCONRY TR
Apply Date:
05/01/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30G Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00556
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/19/2024 | APPROVED |
| 05/02/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00556
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00556
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
| Date | Description | Comments |
|---|---|---|
| 05/10/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 05/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/07/2024 | Post-Tension Inspection Report is required. | |
| 05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/07/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00556
Permit Description: Blackhawk H30G Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 7/30/2024 | |
| 07/30/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 7/30/2024 | |
| 07/30/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 7/30/2024 | |
| 07/30/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/30/2024 | |
| 08/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/06/2024 | COT - RSBU - Preslab | Passed | ||
| 08/06/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/04/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Corrections were made. 9/4/2024 | |
| 09/04/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 9/4/2024 | |
| 09/30/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. 10/1/2024 | |
| 10/01/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/15/2024 | BULD - Electrical Clearance | Passed | PASSED ELECTRICAL CLEARANCE ECO 10/15/24 | |
| 10/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | PASSED INTERIOR SHEER BRACING 10/16/24 | |
| 12/03/2024 | COT - BULD - SWG Clearance | Passed | 12-3-24, approved for Southwest gas connection. Clearance issued. | |
| 12/06/2024 | COT - RSEL - Electrical Final | Passed | 12-6-24, outdoor lighting, electrical, mechanical, plumbing, building finals all approved. | |
| 12/06/2024 | COT - RSEL - Outdoor Lighting | Passed | 12-6-24, outdoor lighting, electrical, mechanical, plumbing, building finals all approved. | |
| 12/06/2024 | COT - RSME - Mechanical Final | Passed | 12-6-24, outdoor lighting, electrical, mechanical, plumbing, building finals all approved. | |
| 12/06/2024 | COT - RSPL - Plumbing Final | Passed | 12-6-24, outdoor lighting, electrical, mechanical, plumbing, building finals all approved. | |
| 12/06/2024 | ENGR Engineering Final | Passed | CO Ready | |
| 12/06/2024 | RSBU - Building Final | Passed | 12-6-24, outdoor lighting, electrical, mechanical, plumbing, building finals all approved. | |
| 12/06/2024 | RSBU - Building Progress | Passed |