Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/30/2023
Applicant:
Erin Dick
Description:
Building B three-story, 24 unit, apartment building model plans

Permit Reviews

Permit Number - TC-MDP-0523-01106
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Start Date Submittal Complete Date Status  
05/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/30/2025 APPROVED Review Details
07/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/08/2024 REQUIRES RESUBMIT Review Details
06/27/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
12/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/11/2024 APPROVED Review Details
05/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/27/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01106
Permit Status: Complete
Permit Description: Building B three-story, 24 unit, apartment building model plans
Date Description Comments
09/16/2024 AIR BALANCING REPORT IS REQUIRED.
04/21/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/21/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/11/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01106
Permite Description: Building B three-story, 24 unit, apartment building model plans
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/01/2024 COT - LCBU - Exterior Clips/Sheathing N/A Partial Pass All of 2nd floor approved. okay to proceed progress areas. 10/1/2024
05/29/2025 COT - LCBU - Building Final N/A Partial Pass 5-29-25: corrections listed from previous inspections to units in question have been corrected. Building final on all unit's from Building 17 are approved pending installation of vanity mirrors on a few units.
06/03/2025 ENGR Engineering Final N/A Deferred CO Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01106
Permit Description: Building B three-story, 24 unit, apartment building model plans
Total Completed Inspections - 29
Date Description Inspector Results Comments
12/01/2023 COT - LCPL - Rough Soil Passed
04/17/2024 COT - LCPL - Yard Water Line Passed 4/17/24: water line under pressure ok to proceed.
04/22/2024 COT - LCEL - Electrical Underground Passed
04/22/2024 COT - LCEL - Grounding/Bonding Passed
04/22/2024 COT - LCBU - Preslab Passed
04/22/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
04/26/2024 COT - LCPL - Sewer Passed 4/26/24: ok to backfill. Shading required
06/05/2024 COT - HCPL - Yard Water Line Passed
07/29/2024 COT - LCBU - Framing Passed
08/07/2024 COT - BULD - SWG Clearance Passed
08/23/2024 COT - LCPL - Gas Pressure Test Passed
08/23/2024 COT - LCBU - Roof Nailing Passed
10/11/2024 COT - LCBU - Exterior Clips/Sheathing Passed All of 3rd floor approved. 10/11/2024
01/17/2025 COT - LCME - Mechanical Intermediate Passed
01/17/2025 COT - LCPL - Plumbing Intermediate Passed
01/17/2025 COT - LCBU - Building Above Ceiling Passed
01/17/2025 COT - LCEL - Electrical Above Ceiling Passed
01/17/2025 COT - LCEL - Electrical Intermediate Passed
01/17/2025 COT - LCME - Mechanical Above Ceiling Passed
01/17/2025 COT - LCPL - Plumbing Above Ceiling Passed
01/28/2025 COT - HCBU - Interior Shear Bracing Passed
03/25/2025 BULD - Electrical Clearance Passed 3-25-25, ECO clearance issued for unit 7202.
05/20/2025 TRSP - ROW - Final/Close-Out Passed Work completed on private property
05/27/2025 COT - FCON - Fire - Final Passed
05/29/2025 COT - LCEL - Electrical Final Passed 5-29-25: mechanical, plumbing, and electrical finals for unit's to Building 17 approved.
05/29/2025 COT - LCME - Mechanical Final Passed 5-29-25: mechanical, plumbing, and electrical finals for unit's to Building 17 approved.
05/29/2025 COT - LCPL - Plumbing Final Passed 5-29-25: mechanical, plumbing, and electrical finals for unit's to Building 17 approved.
05/29/2025 COT - LCEL - Outdoor Lighting Passed 5-29-25, outdoor lighting on all u its for Building 17 approved.
05/30/2025 COT - LCBU - Building Final Passed 5-30-25: Building 17 final for each unit approved.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
EES_250522_WATER_CHLORINATION_REPORT_BLDG17-2025-05-28_V1.PDF DOCUMENTS VIEW
EES_250510_AIR_BALANCE_REPORT_BLDG17-2025-05-21_V1.PDF DOCUMENTS VIEW
EES_241205_PROTEX_VERTICALFINAL_SIC_BLDG17_REPORT-2024-12-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDINGS_17_SPECIAL INSPECTION CERT-2023-06-16_V1.PDF DOCUMENTS VIEW
EES_230616_ SITE PLANS (BLDG 17)_V1.PDF DOCUMENTS VIEW