Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/30/2023
Applicant:
HSLCS Permits
Description:
Building B three-story, 24 unit, apartment building model plans

Permit Reviews

Permit Number - TC-MDP-0523-01105
Permit Status: Issued
Permit Description: Building B three-story, 24 unit, apartment building model plans
Start Date Submittal Complete Date Status  
07/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/08/2024 REQUIRES RESUBMIT Review Details
06/27/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
12/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/11/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01105
Permit Status: Issued
Permit Description: Building B three-story, 24 unit, apartment building model plans
Total Outstanding Activity Conditions - 3
Date Name
04/21/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
09/16/2024 AIR BALANCING REPORT IS REQUIRED.
12/11/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-MDP-0523-01105
Permit Status: Issued
Permit Description: Building B three-story, 24 unit, apartment building model plans
Date Description Comments
04/21/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/21/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/21/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01105
Permite Description: Building B three-story, 24 unit, apartment building model plans
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
02/21/2024 COT - LCBU - Preslab N/A Partial Pass 2/21/24: pre slab passed. Pending breezeway
02/21/2024 COT - LCEL - Grounding/Bonding N/A Not Ready 2/21/24: not ready
02/21/2024 COT - LCEL - Electrical Underground N/A Partial Pass 2/21/24: electrical underground at building slab per plan.
02/21/2024 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 2/21/24: reinforcement per plan at building slabs. Pending breezeway.
09/05/2024 COT - LCBU - Exterior Clips/Sheathing N/A Re-inspection required Not ready. 9/5/2024
11/14/2024 COT - LCEL - Electrical Above Ceiling N/A Re-inspection required 10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.
11/14/2024 COT - LCEL - Electrical Intermediate N/A Re-inspection required 10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.
11/14/2024 COT - LCPL - Plumbing Intermediate N/A Re-inspection required 10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.
11/14/2024 COT - LCME - Mechanical Above Ceiling N/A Re-inspection required 10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.
11/14/2024 COT - LCME - Mechanical Intermediate N/A Re-inspection required 10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.
11/14/2024 COT - LCBU - Framing N/A Re-inspection required 10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01105
Permit Description: Building B three-story, 24 unit, apartment building model plans
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/21/2023 COT - LCPL - Rough Soil Passed
02/20/2024 COT - LCPL - Sewer Passed 2/20/24: HCS connection made. Shading required. Ok to backfill.
02/22/2024 COT - LCBU - Preslab Passed
02/22/2024 COT - LCEL - Grounding/Bonding Passed
02/22/2024 COT - LCEL - Electrical Underground Passed
02/22/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
05/17/2024 COT - LCPL - Yard Water Line Passed
09/05/2024 COT - LCBU - Roof Nailing Passed
09/04/2024 COT - LCPL - Gas Pressure Test Passed
09/09/2024 COT - BULD - SWG Clearance Passed
09/11/2024 COT - LCBU - Exterior Clips/Sheathing Passed 3rd floor approved. 9/11/2024
11/14/2024 COT - LCPL - Plumbing Above Ceiling Passed
11/14/2024 COT - LCBU - Building Above Ceiling Passed
11/20/2024 COT - LCEL - Electrical Above Ceiling Passed
11/20/2024 COT - LCEL - Electrical Intermediate Passed
11/20/2024 COT - LCPL - Plumbing Intermediate Passed
11/20/2024 COT - LCME - Mechanical Above Ceiling Passed
11/20/2024 COT - LCME - Mechanical Intermediate Passed
11/22/2024 COT - LCBU - Framing Passed
12/02/2024 COT - HCBU - Interior Shear Bracing Passed .

Documents

File Name Document Type  
EES_241205_PROTEX_VERTICALFINAL_SIC_BLDG14_REPORT-2024-12-05_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDINGS_14_SPECIAL INSPECTION CERT-2023-06-16_V1.PDF DOCUMENTS VIEW
EES_230616_ SITE PLANS (BLDG 14)_V1.PDF DOCUMENTS VIEW