Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCME - Mechanical Above Ceiling
Permit Number - TC-MDP-0523-01105
Inspection Description - COT - LCME - Mechanical Above Ceiling
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/29/2024 | COT - LCME - Mechanical Above Ceiling | Partial Pass | 10/29/24: third flooring M.E.P above ceiling passed ok to proceed. | |
11/07/2024 | COT - LCME - Mechanical Above Ceiling | Not Ready | 10/29/24: third flooring M.E.P above ceiling passed ok to proceed. 11/7/24: not ready for inspection |
|
11/14/2024 | COT - LCME - Mechanical Above Ceiling | Re-inspection required | 10/29/24: third flooring M.E.P above ceiling passed ok to proceed. 11/7/24: not ready for inspection 10/29/24: third flooring M.E.P above ceiling passed ok to proceed. 11/7/24: not ready for inspection 11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected. |
|
11/20/2024 | COT - LCME - Mechanical Above Ceiling | Passed |