Inspection Status: Canceled

Inspection History: COT - LCBU - Framing

Permit Number - TC-MDP-0523-01105

Inspection Description - COT - LCBU - Framing

Inspection Status - Canceled

Date Description Inspector Results Comments
07/19/2024 COT - LCBU - Framing Canceled 7/19/24: canceled per contractor
11/07/2024 COT - LCBU - Framing Canceled 7/19/24: canceled per contractor
11/7/24: not ready for inspection.
11/14/2024 COT - LCBU - Framing Re-inspection required 10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.
11/21/2024 COT - LCBU - Framing Not Ready 7/19/24: canceled per contractor
11/7/24: not ready for inspection.
10/29/24: third flooring M.E.P above ceiling passed ok to proceed.
11/7/24: not ready for inspection
11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected.
11/21/24: not ready
11/22/2024 COT - LCBU - Framing Passed