Inspection History Details
Inspection Status: Canceled
Inspection History: COT - LCBU - Framing
Permit Number - TC-MDP-0523-01105
Inspection Description - COT - LCBU - Framing
Inspection Status - Canceled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2024 | COT - LCBU - Framing | Canceled | 7/19/24: canceled per contractor | |
11/07/2024 | COT - LCBU - Framing | Canceled | 7/19/24: canceled per contractor 11/7/24: not ready for inspection. |
|
11/14/2024 | COT - LCBU - Framing | Re-inspection required | 10/29/24: third flooring M.E.P above ceiling passed ok to proceed. 11/7/24: not ready for inspection 11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected. |
|
11/21/2024 | COT - LCBU - Framing | Not Ready | 7/19/24: canceled per contractor 11/7/24: not ready for inspection. 10/29/24: third flooring M.E.P above ceiling passed ok to proceed. 11/7/24: not ready for inspection 11/14/24: properly secure NM cable on horizontal runs 48" o.c, box-fill at second floor bathroom on Nw corner overfilled, supports on sprinklers missing throughout, fire caulk all penetrations through top plate and vapor barrier, sleeves for plumbing and electrical must be sealed, nail plates required throughout for electrical and plumbing, support all DWV midway on vertical runs, support all exhaust vents midway on vertical runs, remove all electrical from gusset plates, support main water line at first floor. Over notched bearing studs must be corrected, grounding must be corrected. 11/21/24: not ready |
|
11/22/2024 | COT - LCBU - Framing | Passed |